Installing your Towel Rail
7.
Mark the centers on the wall, note that the towel rail
should be installed so that the bottom rail is at least
600mm above floor level.
6.
Hold the towel rail against the wall in the location
where you want the towel rail mounted. Ensure it is
located parallel using a spirit level. Using a pencil,
mark the four legs position on the wall.
1.
Feed a leg mounting screw through the middle of the
upper leg (upper legs have a welded mounting point
inside the leg). There is a locator hole at the base end
which this screw should line up with and pass through.
2.
Align the screw with the threaded hole of the upper leg
positions on the towel rail, ensure grub screw is facing
down. Tighten so that the legs are secured onto the
upright tube. Do not overtighten, leave just enough
give to allow the leg to rotate and align parallel with
other legs.
3.
Repeat steps 1 & 2 to attach the second upper leg
5.
The last lower leg should be installed either in a
concealed or exposed manner, as per the previous
page. For exposed wiring
–
ensure you use the included
black cable guide to prevent damage to the power
cable.
4.
Using the short lower leg mounting screw, secure the
non-wired side, lower leg by sliding the leg over the
lower leg mount on the towel rail. Ensure the grub
screw is facing down.
NOTE: Use the lower leg with the cutout for the side (either
left or right) where the power cable is located.
B
A
C
D
600mm