GOK 13512 Series Скачать руководство пользователя страница 6

 

Installation and Operating Manual

  

Art. No. 13512-.../13513-... 
Version 10.2012    Page 6

 

 

PERFORMANCE CHECK

 

Provided the construction and the pipeline dimensioning are correct, the air cushion formed in the upper cover 
during start-up will disappear fast. If, after longer period of operation, air is released in the deaerator cover 

, or 

if the burner goes to lock out state, there is a leak in the oil line. More air is aspired than can be handled by 
addition of air to the fuel oil. The leak must be repaired to avoid any risk of fuel oil leakage while the installation is 
at standstill.  
 
A clearly audible noise from the burner pump can be a sign of a clogged-up filter element 

. See 

MAINTENANCE for replacing the filter element. 

Filter cover 

 

not filled to the top  

Air and lightly volatile oil components may outgas from the operating medium and collect before the moistened 
filter element. This applies in particular to single-pipe filters and low flow volumes. However, the invisible interior 
of the filter element is completely filled with the operating medium, so that safe operation is not affected if the 
filter cover is not filled to the top.  
Should the filter cover level drop or should the cover fall dry, there is a leak in the system. 

MAINTENANCE 

 

The following checks are recommended in the course of annual maintenance or after prolonged standstill: 

  Check the deaerator and the connections for leaks 

  Visually check the plastic filter cover 

 

and the deaerator cover 

 for damage: tears or deformation 

  Replace the filter element 

 

A damaged or destroyed plastic filter cover 

 

must be replaced for a new one. Steps to take when changing the 

filter element: 

The deaerator cover 

 

can only be replaced as a complete assembly, i.e. together with deaerator screw 

.

 

If the system has been submerged, any outside soiling of the filter should be cleaned off with a commercially 
available household cleaning agent. 
Do not use cleaning agents containing solvents as they might damage the plastic filter cover or other plastic 
parts, e.g. the handle.                                      For spares, see 

List of spare parts

 

Replacing the filter element 

 

Switch the burner off and stop the oil column from returning into the oil storage container - close the stop valves. 

Use the collecting device! 

Type 500

 

Type 500 with easy-change filter

 

Turn retaining ring anti-clockwise 

 to loosen it, hold and 

remove filter cover 

 

Loosen the easy-change filter by turning it 
anti-clockwise 

 

Hold up the adapter with open-end spanner 
SW 70.

 

Take care not to damage the O-ring. Replace it if necessary (a 
new O-ring must be oiled!) Only use red GOK O-rings!

 

Unscrew the old filter element

 

Clean the sealing area and the O-ring

 

Oil the O-ring of the new easy-change filter

 

Insert new filter element 

, ensure tight fit

Hold the filter cover 

 

and the O-ring in position and tighten by 

hand by turning the retaining ring 

 clockwise. 

Hold the new easy-change filter in position 
and tighten it by turning it clockwise.

 

Check for existing leaks, make sure no leaks will occur!

 

Take special care to clean lengths of line to be installed downstream of the filter thoroughly before mounting.

 

To continue, see START-UP and OPERATION

 

OVERHAUL / REPAIR

 

If the measures explained under the headings START-UP, OPERATION and MAINTENANCE fail to achieve 
regular re-START, and provided the construction and dimensions are correct, the GS Pro-Fi 3 must be removed 
and sent to the manufacturer’s for a check-up. Any unauthorized handling will result in loss of the qualification 
approval and any warranty claims.

 

Содержание 13512 Series

Страница 1: ...n system of the 3 generation It is designed as a closed system Geschlossenes System GS It corresponds to the requirements of EN 12514 2 2000 the code of practice for oil firing according to BS 5410 1...

Страница 2: ...VS 6 RVS 8 RVS 10 EN ISO 8434 1 GOK universal connection fittings UA 6 8 10 mm Screwed clamping ring connection brass Initial testing of construction products by a notified body HP Burner flow line Fe...

Страница 3: ...The bleeder line dimensions should provide for a mean fuel flow rate of 0 2 to 0 5 m s If the diameter of the pipes is too large low flow rates occur which can result in formation of undesirable gas...

Страница 4: ...of a screwed connection with brass or steel cutting ring for your information Component Connection via Explanations GS Pro Fi 3 Connecting branch in RVS 6 8 10 or 12 optionally available as factory mo...

Страница 5: ...at the deaeration screw by means of the enclosed adapter Art no 13610 60 We recommend continuing the suction process until the upper cover is filled with oil as well After that re tighten the deaerat...

Страница 6: ...deaerator cover can only be replaced as a complete assembly i e together with deaerator screw If the system has been submerged any outside soiling of the filter should be cleaned off with a commercial...

Страница 7: ...perating medium and environment Maximum permissible pressure PS 6 bar with plastic cover PS 10 bar with easy change filter element PS 16 bar with metal cover Material of housing Metal ZP0410 Normal fl...

Страница 8: ...ersion 10 2012 Page 8 GOK Regler und Armaturen Gesellschaft mbH Co KG Obernbreiter Stra e 2 16 D 97 340 Marktbreit Phone 49 9332 404 0 Fax 49 9332 404 43 E mail info gok online de Internet www gok onl...