Serires KMI
- 5 -
November 4, 2013
Goch GmbH & Co. KG
Important
This appliance must be installed in accordance with current connection and installation
regulations and may only be used in adequately ventilated rooms. The installation and operating
instructions must be inspected and understood before installation and before start-up.
Before installation it must be checked whether local gas distributions, gas types and gas
pressures as well as the settings of the appliance are compatible.
General information
GoGaS infrared heaters are manufactured in accordance with ANSI Z83.19-2009/CSA 2.35-
2009. Each appliance is subjected to a function test before it leaves the factory and is preset to
the relevant gas type. For setting up and operating radiation equipment, the following
regulations and guidelines must be complied with.
This heater maybe approved for either indoor or outdoor installation. Not for use in
residential dwellings, refer to Rating plate.
Installation Codes
The installation must conform with local building codes or, in the absence of local codes, with
the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane
Installation Code, CSA B149.1.
General Installation and Gas Codes/Electrical Codes
If an external electrical source is utilized, the heater, when installed, must be electrically
grounded in accordance with the National Electrical Code, ANSI/NFPA 70, or current Canadian
Electrical Code, CSA C22.1.
Aircraft Hangar Installation
Installation in aircraft hangars must conform to the Standard for Aircraft Hangars, NSI/NFPA 409
in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada
Public Garages
Installation in public garages must conform to the Standard for Parking Structures, NFPA 88A or
the Standard for Repair Garages, NFPA 88B, in the US and CAN/CGA B149.1 and B149.2
Installation Codes in Canada.
Parking Structures
Technical requirements are outlined in ANSI/NFPA 88A (USA)
Warning:
Heaters should be installed so that the minimum clearances marked on the heater will
be maintained from vehicles parked below the heater.
Important
These instructions, the layout drawing, local codes and ordinances, and applicable
standards such as apply to gas piping and electrical wiring comprise the basic information
needed to complete the installation, and must be thoroughly understood along with general
building codes before proceeding.
Only personnel who have been trained and understand all applicable codes should
undertake the installation. SRP Representatives are Factory Certified in the service and
application of this equipment and can be called on for helpful suggestions about installation.