GoFit ELEVATED CHIN UP STATION Скачать руководство пользователя страница 4

2

Step 9   

Place Lock Washer onto Hex Bolt end; 

thread on Lock Nut. Repeat for each  

Hex Bolt on each Side Bar as shown.

Step 8   

Position Straight Bar as shown in fully 

assembled photo. Line up Straight Bar 

holes with Side Bar holes; slide Hex Bolt 

with Lock Washer through holes as shown.

Step 7   

Place Lock Washer onto Eye Bolt end; 

thread on Short Capped Nut. Repeat for 

each Eye Bolt on each Side Bar.

Step 10   

Put Chin Up Station in Push Up Position 

on a flat surface to level. Then securely 

tighten all Nuts with wrench. Fully  

assembled Chin Up Station shown  

to the left for reference.

Easy In-Out Installation

Standing on non-hinge side of doorway, 

put Leverage Bar through doorway while 

moving it upward—position it above 

moulding to securely hang on door frame.

Position bottom edge of Leverage Bar into 

the installed metal wedge, then guide 

Chin Up Station down until it securely 

rests on top of door frame/moulding.

Make sure the protective Foam End 

Pieces on the non-hinge side of doorway, 

are in full contact with and resting against 

the two side door frame mouldings.

Fully Assembled

Metal wedge

ELEVATED CHIN UP STATION

For questions or missing parts, please contact GoFit at 888-530-4441     

 

 

 

     

©2012 GOFIT, L.L.C.  TULSA, OK

Содержание ELEVATED CHIN UP STATION

Страница 1: ...r 2 halves 1 Leverage Bar 2 Eyebolts 2 Self seating Bolts 3 Hex Bolts with Lock Nuts 12 Lock Washers 1 Hex Bolt with Capped Nut 4 Capped Nuts 1 Metal Wedge Tools required Adjustable Wrench ELEVATED CHIN UP STATION For questions or missing parts please contact GoFit at 888 530 4441 2012 GOFIT L L C TULSA OK Adjustable Height ...

Страница 2: ...ge downward behind door frame moulding Position bottom edge of Plastic Leverage Bar into the installed safety wedge guiding it down to securely rest on top of door frame moulding Properly installed the Metal Wedge helps keep the Leverage Bar resting on the door frame moulding Before each exercise always check that the Leverage bar is resting on the door frame moulding ...

Страница 3: ...CHIN UP STATION Step 6 Position Curved Bar as shown in fully assembled photo make sure the Capped Nut side of Curved Bar is facing out towards the handles Line up holes in Curved Bar with holes in Side Bars slide Eye Bolt through holes as shown Step 5 Slide two halves of Curved Bar together small end into larger end Line up holes and put Bolt through hole on Curved Bar Place Lock Washer on Bolt th...

Страница 4: ...h wrench Fully assembled Chin Up Station shown to the left for reference Easy In Out Installation Standing on non hinge side of doorway put Leverage Bar through doorway while moving it upward position it above moulding to securely hang on door frame Position bottom edge of Leverage Bar into the installed metal wedge then guide Chin Up Station down until it securely rests on top of door frame mould...

Отзывы: