GoFit ELEVATED CHIN UP STATION Скачать руководство пользователя страница 1

Parts

Prior to assembly, confirm that  

all parts are included in box:

  -2 Side Bars (C-shaped) 

  -1 Curved Bar (2 halves) 

  -1 Straight Bar (2 halves) 

  -1 Leverage Bar 

  -2 Eyebolts 

  -2 Self-seating Bolts 

  -3 Hex Bolts with Lock Nuts 

  -12 Lock Washers 

  -1 Hex Bolt with Capped Nut 

  -4 Capped Nuts 

  -1 Metal Wedge 

Tools required: 

-Adjustable Wrench

ELEVATED CHIN UP STATION

For questions or missing parts, please contact GoFit at 888-530-4441     

 

 

 

     

©2012 GOFIT, L.L.C.  TULSA, OK

AdjustAble HeigHt

Содержание ELEVATED CHIN UP STATION

Страница 1: ...r 2 halves 1 Leverage Bar 2 Eyebolts 2 Self seating Bolts 3 Hex Bolts with Lock Nuts 12 Lock Washers 1 Hex Bolt with Capped Nut 4 Capped Nuts 1 Metal Wedge Tools required Adjustable Wrench ELEVATED CHIN UP STATION For questions or missing parts please contact GoFit at 888 530 4441 2012 GOFIT L L C TULSA OK Adjustable Height ...

Страница 2: ...ge downward behind door frame moulding Position bottom edge of Plastic Leverage Bar into the installed safety wedge guiding it down to securely rest on top of door frame moulding Properly installed the Metal Wedge helps keep the Leverage Bar resting on the door frame moulding Before each exercise always check that the Leverage bar is resting on the door frame moulding ...

Страница 3: ...CHIN UP STATION Step 6 Position Curved Bar as shown in fully assembled photo make sure the Capped Nut side of Curved Bar is facing out towards the handles Line up holes in Curved Bar with holes in Side Bars slide Eye Bolt through holes as shown Step 5 Slide two halves of Curved Bar together small end into larger end Line up holes and put Bolt through hole on Curved Bar Place Lock Washer on Bolt th...

Страница 4: ...h wrench Fully assembled Chin Up Station shown to the left for reference Easy In Out Installation Standing on non hinge side of doorway put Leverage Bar through doorway while moving it upward position it above moulding to securely hang on door frame Position bottom edge of Leverage Bar into the installed metal wedge then guide Chin Up Station down until it securely rests on top of door frame mould...

Отзывы: