![Godrej SeeThru Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/godrej/seethru/seethru_user-manual_2238194009.webp)
5. Installation
Monitor installation location
Standard monitor installation height is about 1,500mm where screen
centre is at eye level; in this case, wall-hanging metal centre is 1,450mm
above ground level.
5.1 Installation Location
5.2 Wire & Monitor Installation
1) Push down the button
with screwdriver
2) Put the wire into the
hole from the bottom
3) Release the screwdriver
4) Check the fastness of
the wire
5) Remove wall-hanger
bracket behind monitor
6) Install wall-hanger
bracket
7) Connect wires to back
terminal of monitor,
referring to connection
diagram
8) Hang monitor on wall-
hanging, and fix monitor
on wall-hanger bracket
9) Plug monitor’s power
plug into power socket
13
14
5. Installation
Содержание SeeThru
Страница 22: ...Notes Notes 39 40...