
Page 4 of 6
5. Adjust length of base assembly to align cross
supports holes with the predrilled holes in the
worksurface. Locate aligned holes in front and
back rail sections and insert a 20mm step bolt
through each. Secure with (2) 8mm nuts.
x2
6. Fasten base assembly to work surface
using (12) #8 x 16mm Phillips head
screws on each leg.
x12
Work Surface Damage Warning:
Take precaution to use only
#8 x 16mm Phillips head screws
to attach base assembly.
go2wfh.com
pre-drilled
holes
pre-drilled
holes