GO2 SKYE Скачать руководство пользователя страница 4

Page 4 of 6

5.  Adjust length of base assembly to align cross 

supports holes with the predrilled holes in the 

worksurface. Locate aligned holes in front and 

back rail sections and insert a 20mm step bolt 

through each. Secure with (2) 8mm nuts.

x2

 

6.  Fasten base assembly to work surface 

using (12) #8 x 16mm Phillips head 

screws on each leg. 

x12

Work Surface Damage Warning:

Take precaution to use only 

#8 x 16mm Phillips head screws

to attach base assembly.

 go2wfh.com

pre-drilled

holes

pre-drilled

holes

Отзывы: