GMP AirStream 89299 Скачать руководство пользователя страница 4

Page 4 

1.0 SAFETY INSTRUCTIONS 

 

THIS EQUIPMENT SHOULD BE USED ONLY BY PERSONNEL WHO HAVE BEEN GIVEN THE 

APPROPRIATE TRAINING, AND WHO ARE COMPETENT TO USE IT. 

THESE INSTRUCTIONS ARE TO BE MADE AVAILABLE TO OPERATORS OF THIS EQUIPMENT 

AT ALL TIMES, FAILURE TO OBSERVE THESE SAFETY INSTRUCTIONS COULD RESULT IN 

SERIOUS PERSONAL INJURY AND/OR PROPERTY DAMAGE. 

 

WORK AREA AND GENERAL SAFETY 

 

1.  Read and understand the operation and maintenance manual supplied with this equipment.  Keep it in a 

convenient place for future reference. 

2.  Keep children and untrained personnel away from this equipment while in operation. 

3.  Keep all guards and safety devices in place.  Do not operate this equipment with guards removed or dam-

aged. 

4.  Keep hands, feet and loose clothing away from moving parts, especially at cable entry points. 

5.  Always stop the machine and isolate compressed air and electrical services to carry out lubrication and ser-

vicing. 

6.  Check machine before starting for worn or damaged parts.  Check for signs of loose nuts and bolts etc. 

7.  If machine is left unattended, ensure that unauthorized use is prevented. 

8.  Never leave the machine unattended while in use. 

9.  Consider the use of safety barriers, especially when used in public places, observe all statutory require-

ments for working environments. 

10.  Beware of pinch points involved with rotating components, 

11.  Beware of hot surfaces, machine uses compressed air. 

12.  When operating machine always wear appropriate safety clothing, ear defenders, eye protection, hard hat, 

safety shoes and leather gloves, machine operates with compressed air at up to 15 Bar. 

13.  Prior to installation ensure the microduct route is connected properly. 

14.  Beware of exposed electrical contacts.  Do not touch, or allow metal objects to come into contact. 

15.  Machine may cause additional fire hazard if involved in an existing fire due to compressed air. 

16.  No personnel are to be in manholes or ducts when the Cable Blowing Machine is being operated. 

17.  The machine must be operated on firm ground. 

18.  Stay clear of cables or lines under tension. 

19.  Stay clear of pressurized air line and microduct. 

20.  Only use the machine for its intended purpose, do not use the roller drive without the air chamber to push 

or to retrieve cable, blow air in the far end to help cable recovery. 

21.  Do not place cable drum too close to the Cable Blowing Machine. 

22.  The compressed air supply must not be allowed to enter the air chamber or microduct before the rollers 

have been closed on to the cable.  Do not turn the air on until a reasonable length of cable 150 ft. (50m) has  

been installed into the microduct. 

23.  Ensure the cable drum rotates freely on its stand, the cable should leave from the top of the drum. 

24.  The cable should enter the machine in a clean and dry condition.  In damp, dusty atmospheres, the cable 

should be cleaned continuously as it enters the machine. 

 

FAILURE TO DO SO MAY RESULT IN PERSONAL INJURY, AS THE CABLE COULD 

BE EJECTED FROM THE CABLE BLOWING MACHINE WITH HIGH FORCE AND 

VELOCITY. 

Содержание AirStream 89299

Страница 1: ...duced or transmitted in any form whatso ever without the written permission of General Machine Products Co Inc General Machine Products Co Inc 3111 Old Lincoln Hwy Trevose PA 19053 USA TEL 1 215 357 5...

Страница 2: ...26 14 Reformat for US A Konschak 03 April 8 15 Updated air supply quality A Konschak 04 Jan 13 2016 Update Oiler adjustment and Oiler fill Removed service details Added 8 5mm A Konschak 05 March 22 2...

Страница 3: ...nging the air box infeed guide 12 Procedure for changing the cable drive belts 13 Procedure for tensioning the drive belts 14 Procedure for checking and replacing the air motor drive belt 15 Tensionin...

Страница 4: ...d air 12 When operating machine always wear appropriate safety clothing ear defenders eye protection hard hat safety shoes and leather gloves machine operates with compressed air at up to 15 Bar 13 Pr...

Страница 5: ...ed Ensure the ball valve and flow control valve are fully closed before connecting the air supply to the motor system Unwanted operation and personal injury may otherwise result Only authorized fully...

Страница 6: ...15 BAR AIR PRESSURE MICRODUCT CLAMP SECURELY TIGHTENED COMPRESSOR CAPACITY 1 5m3 min 15 BAR CONTAINING NO MORE THAN 7 732 G M 3 RE SIDUAL WATER CONTENT WITH A PRESSURE DEW POINT OF 3 DEG C AS PER DIN...

Страница 7: ...ure that the cable is protected during installation Due to the variety and different methods of cable manufacture the responsibility of checking the cable compatibility with the equipment lies with th...

Страница 8: ...and simple to operate by having only one power source This means there is no need to have a generator on site only a compressor is required The machine may be placed on the ground or on a support to...

Страница 9: ...e machine See sketch below this shows a plan view of the recommended set up Ensure the machine is secure either on its own stand or a separate suitable stand Ensure the machine is fitted with the appr...

Страница 10: ...uct the length of microduct under ground into which the cable is to be in stalled using a suitable connector Slide a suitable size O ring over the end of the microduct Fit the microduct into the end o...

Страница 11: ...l housing Open the ball valve and slowly turn the flow control valve knob counter clockwise until the belts are just moving Take the cable to be installed and pass it through the infeed guide so that...

Страница 12: ...mbly is free to move This thumb screw is attached to the clamp arm lever The clamp arm lever controls the position of the roller as sembly As the clamp arm is moved around the arc the belts move toget...

Страница 13: ...holding the battery box to the control housing to release them and gain access Place the batteries in the cradle connect the power leads and then replace the battery box into its slot Push the 4 catch...

Страница 14: ...GMP Pneumatic Airstream machine is ideally suited to this type of operation it may be coupled with a second machine to increase the distance a single cable can be installed without couplings The only...

Страница 15: ...pressure regulator it al lows the operator to set the correct pressure before he she begins installing The valve along with the flow control valve should always be closed before the air line is conne...

Страница 16: ...he cable can feed all the way along the microduct and out the other end It will be necessary to be able to determine when the cable has emerged at the other end of the microduct route A typical way of...

Страница 17: ...Use any traditional workshop cleaning agent 6 0 Maintenance The GMP AirStream Cable Blowing Machine has been designed to give reliable trouble free service over long periods The machine requires no s...

Страница 18: ...ible from entering the drive belt assemblies will aid the performance of the machine If necessary remove the drive belts See section 12 0 and clean the assemblies Ensure free rotation of rollers and s...

Страница 19: ...he air box Loosen and remove the m4 fixing screw Do not lose this screw it will be needed for the replacement insert Remove the insert Repeat the process for the insert in the other box half To fit th...

Страница 20: ...remove the M2 5 screw securing the guide into the housing Remove and replace the guide If both long and short inserts are used the long inserts are mounted in the housings at the machine inlet Long I...

Страница 21: ...groove glue surface down starting at the end with the retainer plate and aligning flush with the end of the groove Work your way around pressing the seal into the groove and allowing the excess mater...

Страница 22: ...is necessary to install a cable which will sustain crushing damage when light compression forces are applied to it It will be necessary to use a belt with a surface coating with high friction charact...

Страница 23: ...Place the new belt in position on the drive pulley place the idler pulley around the other end and replace the idler pulley onto the tensioning shaft Replace the tension nut and then tension as descr...

Страница 24: ...ion is reached tighten the tension nut Note tightening the nut will tighten the belt slightly please set the tension screw to compensate for this The tension belt should have approximately 1 4 6 mm of...

Страница 25: ...ine base as shown below Turn the machine over revealing the motor drive belt Loosen the set screw retaining the idler pulley as indi cated below The shaft retaining the pulley should now be free to re...

Страница 26: ...uld require the removal of the air chamber as sembly to gain access to its mounting screw through the top plate Slacken the M6 CSK screw and rotate the tensioner housing to pre load the arm to create...

Страница 27: ...ubricator oil level there is a slot in the front of the control housing see Fig 1 Through this the oil level should be visible Alternatively while removing changing the battery the bowl see Fig 2 will...

Страница 28: ...is in opera tion The operator can observe the oil being added via the sight glass just below the knob If more than three 3 drops per minute is being added turn the knob in the minus direction until th...

Страница 29: ...completed can be entered into the spaces provided in this table This will give the user a record of what service has been carried out and when 1 Check the tool box ensure all tools and interchangeable...

Страница 30: ...Page 30 18 0 SERVICE HISTORY RECORD Service no Date Carried out by Record of service repair...

Страница 31: ...icated The easiest and most straightforward way to complete these checks is to set the machine up for a normal ca ble insertion but fit a seal in place of the cable The microduct can then be pressuriz...

Страница 32: ...the microduct integrity has been confirmed by the method outlined above The microduct may be lubri cated Open the air box and microduct clamp assembly as shown in the sketch above withdraw the microd...

Страница 33: ...e Appendix 1 4 2 mm cord seal See Appendix 1 5 315 mA Fuses P N 89593 6 Motor Drive Belt P N 34742 For spare parts always quote the machine type and serial number and contact General Machine Products...

Страница 34: ...from the exhaust Again if not there is a connection prob lem here Open the flow control valve so the motor begins to turn if the motor turns but the drive belts do not this would suggest an issue with...

Страница 35: ...TO 6 4mm DIAMETER 89378 CABLE SEAL COLLET ASSEMBLY 6 4 TO 8 0mm DIAMETER 89379 CABLE SEAL COLLET ASSEMBLY 8 0 TO 9 5mm DIAMETER 89373 CABLE SEAL COLLET ASSEMBLY 9 5 TO 11 0mm DIAMETER SPARE CABLE SEA...

Страница 36: ...torque control pressure setting a little further Eventually the cable will buckle The torque con trol pressure setting is now a little too high Reduce the pressure a little This is the optimum settin...

Страница 37: ...o Use to increment digit this instruction applies to all following number inputs Hold and press o diV Cnt is displayed Press Enter value 01 0000 Hold and press o dP Cnt is displayed Press until 0 is...

Страница 38: ...38 Press Enter value 01 0 Hold and press o EndPro is displayed Press un l YES is displayed Hold and press o Programming completed OR Press un l no is displayed Hold and press o Programming mode resta...

Страница 39: ...Page 39...

Страница 40: ...Page 40 GMP 3111 Old Lincoln Hwy Trevose PA 19053 USA TEL 1 215 357 5500 FAX 1 215 357 6216 EMAIL info gmptools com...

Отзывы: