c)
The tightening of the nuts should be done in stages. Following the recommended sequence, tighten
nuts per wheel torque;
Table 5-3 Wheel Torque Table
Torque Sequence
1st Stage
2nd Stage
3rd Stage
75 Nm/54.3 ft·lb
150Nm/108.5 ft·lb
275 Nm/198.9 ft·lb
d)
Wheel nuts should be torqued after first 50 hours of operation and after each wheel removal. Check
and torque every 3 months or 150 hours of operation.
$-(%RRP/LIW2SHUDWRU¶V0DQXDO
3DJH
Содержание 64/40 AJ-E
Страница 1: ...23 5 725 6 0 18 DQXDU...
Страница 2: ...RRP LIW 2SHUDWRU V 0DQXDO 3DJH L 5HYLVLRQ LVWRU DWH 8SGDWH 5HDVRQ...
Страница 5: ...RRP LIW 2SHUDWRU V 0DQXDO 3DJH LY...
Страница 75: ...RRP LIW 2SHUDWRU V 0DQXDO 1RWHV...