Global Mainstream Dynamic Energy Technology Ltd.
- 36 -
User Manual
GHESS 9.8-14.4-TH hybrid system
Powervortex 309KTL only have PV2 port connected with PV string; the CNY should be set to 03
when Powervortex 309KTL PV1 and PV2 ports are connecting with different PV strings
respectively. The CNY should be set to 04 when Powervortex 309KTL PV1 and PV2 ports are
connecting with same PV string.
The system default value is 03; please press “OK” to modify it. Press “OK” to finish this setting and
you will enter the setting interface as shown in Figure.
Note: This setting should be operated when the Powervortex 309KTL is under “wait” status,
otherwise“E05” Error might occur.
4.1.5.9 Setting Operation Mode
Figure 38 Operation mode setting
MDE refers to operation mode. The MDE code “00”refers to self-use mode“01”refers to
time-of-use mode. The default value is 00 and press “OK” to modify it.
If modify MDE value into”01”as shown in Figure 39 press “OK” the system will enter the charging
time range setting interface as shown in Figure 40. For example, if you want the system start to
charge the battery at 22.00 and stop charging at 5.00 next morning, then please set the digits
on Figure 39 as “22:00 05:00” respectively. The charging current is the same as the Ic that has
been set in Section 4.1.5.7.
Press “OK” to enter into the discharging time range setting interface as shown in Figure 41. Like
setting the charging time range as above, if to discharge the battery from 8am to 5pm(17:00)
every day, then please set the digits on Figure 41 as “08:00 17:00” . The discharging current is
the same as the Id current that has been set in 4.1.5.6.