Global Mainstream Dynamic Energy Technology Ltd.
- 17 -
User Manual
GHESS 9.8-14.4-TH hybrid system
Figure 12 Put battery into lower Battery Cabinet
2. Lay the upper Battery Cabinet on the lower Battery Cabinet, lock the upper and lower
Battery Cabinet with screws
Figure 13 Installing Battery Cabinets
3. Install the rest 3 battery modules into the upper cabinet