Global Mainstream Dynamic Energy Technology Ltd.
- 19 -
User Manual
GHESS 3.7-4.8-SL hybrid system
-
+
-
-
-
+
+
+
SOC
ALM
SW
AD
D
CAN
RS485
Link Port0
Link Port1
POWE
R
ON
OFF
IN
+
C
O
M
1
C
O
M
3
N
O
1
N
O
2
N
O
3
G
N
D
SW
POWE
R
ON
OFF
AD
D
RUN
RUN
Console
Console
SOC
ALM
RS485
CAN
Link Port1
Link Port0
IN
+
G
N
D
N
O
1
C
O
M
1
N
O
2
C
O
M
2
N
O
3
Cabinet 1
D6
D7
D5
RS485
1#
2#
To Meter
To Inverter
To Cabinet
-
+
-
-
-
+
+
+
SOC
ALM
SW
AD
D
CAN
RS485
Link Port0
Link Port1
POWE
R
ON
OFF
IN
+
C
O
M
1
C
O
M
3
N
O
1
N
O
2
N
O
3
G
N
D
SW
POWE
R
ON
OFF
AD
D
RUN
RUN
Console
Console
SOC
ALM
RS485
CAN
Link Port1
Link Port0
IN
+
G
N
D
N
O
1
C
O
M
1
N
O
2
C
O
M
2
N
O
3
Cabinet 2
D6
D7
D5
RS485
3#
4#
To Cabinet
Link Port 0
Figure 16 Battery cabinet electric wiring diagram
Connect the two battery modules as above Figure 16.
Figure 17 Electric Wiring between Powervortex 3700TL and Battery Cabinet
3.2.3 Mounting Energy Meter
The energy meter should be mounted on the AC side of the hybrid system, between the system
and the grid. Generally the energy meter is mounted between the system and the household