5
·
Foundation
: The machine requires a plain & stable ground to have an excellent bending
performance. It is better to be fixed on 150mm reinforced concrete ground.
·
Leveling
: Four sheet shims are placed under the adjusting bolt of the foot plate, the
machine is leveled by level gauge.
·
Cleaning
: Use a liquid solvent such as kerosene or white spirit to remove the protective
coating and any dirt from the up-painted surface of the machine. Don’t disturb any
moving parts until the full surface has been cleaned.
4. ELECTRICAL CONNECTION
·Before connecting machine into local 3-phase ac source at your plant, please double
check same voltage and phase.
·Connect the ac source with machine cable which has 4 wires, correctly, the ground wire
must be connected with ground.
·After connecting ac source to shaft, check motor rotation is in the correct rotation
direction as per the arrow on the motor.
·If wrong direction, please immediately stop motor to avoid motor damage. Please
correct your connection at ac source until motor rotation direction is in the correct
direction.
III.
OPERATION INSTRUCTION
For models#
PBR-0412E/ PBR-04316E / PBR-0425E / PBR-0510E / PBR-0610E/ PBR-0810E &
PBR-1010E:
1.Press the down push button to move the bending roll down
2. Put the sheet metal material into the rolls as picture shown and crank the big
hand-wheel to barely touch the material.
Width of the sheet metal – is necessary to form the designed size circles is the 1
st
Содержание PBR-0412
Страница 1: ......
Страница 2: ......
Страница 17: ...ELECTRICAL DIAGRAM FOR PBR 0412E 04316E 0425E 0510E 0610E 0810E 1010E 16 ...
Страница 18: ...VIII Electrical Diagrams for Manual Models ELECTRICAL DIAGRAM FOR PBR 0412 PBR 04316 PBR 0510 17 ...
Страница 19: ...IX Part Breakdown for E Models PARTS BREAK DOWN FOR PBR 0412E 04316E 0425E 0510E 0610E 0810E 1010E 18 ...
Страница 22: ...X Part Breakdown for Manual Models PARTS BREAK DOWN FOR PBR 0412 P BR 04316 PBR 0510 21 ...
Страница 27: ......