![Glowworm GC 41 319 08 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/glowworm/gc-41-319-08/gc-41-319-08_installation-and-servicing-instructions_2234643022.webp)
22
221051B
22
SECTION
Installation
6
s t e p
4
2899
Rear Flue Boiler
Installation
THE BOILER IS SUPPLIED FOR
REAR FLUE OUTLET.
Note: To reduce the total lifting weight
remove the electrical control box and
combustion chamber assembly by
following the instructions in Section 6,
step 18 and Section 10, steps 3,5,6,7,8
and 9.
Lift the boiler into position above the
top mounting bracket, allow the boiler
to slide down the wall onto the top and
bottom wall mounting brackets.
Check the engagement by pulling the
boiler forwards at its base, there should
be no forwards movement.
Secure the flue assembly to the boiler,
using the previously fitted dogpoint
screws noting that these are keyhole
fixings.
Make sure of the correct location of the
flue to the boiler.
When the boiler is correctly located
secure it with the two screws.
s t e p
6
s t e p
5
LOCATION
LUG
KEYHOLE
BOTTOM
MOUNTING
BRACKET
TOP
MOUNTING
BRACKET