Glowworm EASICOM 3 25s Скачать руководство пользователя страница 12

12

Installation and maintenance instructions EASICOM 3 0020238426_04

6.6.2

Position of the air/flue terminal

J

J

N

Q

S

S

P

U

B

Boundar

y

G

D

J

J

R

V

M

T

G

C

W

E

F

L

A

K

S

P

S

F

X

A

Y

Boundar

y

Z

H

Aa

S

Z

Ba

6.6.2.1 Positioning the terminal of a fan-supported flue system

Installation site

Dimen-
sions

A

Adjacent to a boundary.

300 mm

B

1)

The dimension below eaves, balconies and car ports can be reduced to this value, as long as the flue terminal is
extended to clear any overhang. External flue joints must be sealed with a suitable silicon sealant.

25 mm

C

Between a vertical flue terminal and a window or dormer window on a roof.

1,500 mm

D

Between terminals facing each other.

1,200 mm

E

Vertical flue clearance, adjacent to a boundary line.

300 mm

F

2)

Distance to a boundary line, unless it will cause a nuisance. BS 5440:Part 1 recommends that care is taken when
siting terminal in relation to boundary lines.

600 mm

G

Minimum clearance from a skylight to a vertical flue or to another vertical flue.

Min.
300 mm

H

Vertical flue clearance, to noncombustible building material.
Vertical flue clearance to combustible building material.

500 mm
1,500 mm

J

Above, below and either side of an opening door, air vent or opening window.

300 mm

K

Diagonally to an opening door, air vent or opening window.

600 mm

L

2)

To an internal or external corner.

200 mm

M

Below a Velux window.
Above or to either side of the Velux window.

2,000 mm
600 mm

N

From a pitched roof.
In regions with heavy snowfall.

400 mm
500 mm

P

From vertical drain pipes and soil pipes.

25 mm

1) There should be no ventilation/opening in the eaves within 300 mm distance of the terminal.
2) These dimensions comply with the building regulations, but they may need to be increased to avoid wall staining
and nuisance from pluming depending on site conditions.

Terminals must be positioned so to avoid combustion products entering the building.

Support the flue at approximately one metre intervals and at a change of direction, use suitable brackets and
fixings.

Installations in car ports are not recommended.

The flue cannot be lower than 1 metre from the top of a lightwell due to the build up of combustion products.

Dimensions from a flue terminal to a fanned air inlet to be determined by the ventilation equipment.

Содержание EASICOM 3 25s

Страница 1: ...en Installation and maintenance instructions EASICOM 3 25s 0020238426_04 31 07 2020...

Страница 2: ...icient water pressure 25 9 6 Flushing the heating installation for the first time cold 25 9 7 Filling and purging the heating installation 26 9 8 Filling the domestic hot water circuit 26 9 9 Checking...

Страница 3: ...direct use in industrial or commercial processes Any use other than those described in these instructions and any use that goes beyond what is described here 1 2 Qualification The person carrying out...

Страница 4: ...ially available soft soap to aid installa tion 1 3 3 Electricity The power supply terminals L and N remain live even if the unit main switch is switched off To prevent electric shocks proceed as fol l...

Страница 5: ...the product in rooms prone to frost 1 3 10 Safety devices Install the necessary safety devices in the installation 1 4 Regulations directives laws standards Observe the national regulations stand ard...

Страница 6: ...ant group com Spares Enquiries Telephone 01773 881383 To register your Glow worm appliance visit Glow worm is a licensed member of the Benchmark Scheme Benchmark places responsibilities on both manufa...

Страница 7: ...n 6 1 kW Technical data Heating EASICOM 3 25s Maximum heating flow temperat ure factory setting D 71 75 Max range of the flow temperat ure control 10 to 80 EASICOM 3 25s Safety discharge of expansion...

Страница 8: ...ol purposes 3rd and 4th digits year of production For quality control purposes 5th and 6th digits week of production For identification purposes 7th to 16th digits product article number For quality c...

Страница 9: ...To restart the boiler press the reset button on the boiler interface If the boiler fails to resume normal operation and all external controls are calling for heat then call your Installation Servi cin...

Страница 10: ...d the current ETCI rules If the boiler is to be installed in a timber frame building it should be fitted in accordance with the current version of the Institute of Gas Engineers document IGE UP 7 If i...

Страница 11: ...ng to its type for example C13 Whatever the kind of flue system chosen observe the minimum distances to position the flue terminals To install the flue refer to the separate flue instruction supplied...

Страница 12: ...rance to noncombustible building material Vertical flue clearance to combustible building material 500 mm 1 500 mm J Above below and either side of an opening door air vent or opening window 300 mm K...

Страница 13: ...id wall staining and nuisance from pluming depending on site conditions Terminals must be positioned so to avoid combustion products entering the building Support the flue at approximately one metre i...

Страница 14: ...rd is required if persons could come into con tact with the terminal or the terminal could be subject to dam age If a terminal guard is required it must be positioned to provide minimum of 50 mm clear...

Страница 15: ...install the flue system 6 7 Using the mounting template Use the mounting template to ascertain the locations at which you need to drill holes 6 8 Wall mounting the product A B 1 Check the load bearin...

Страница 16: ...16 Installation and maintenance instructions EASICOM 3 0020238426_04 2x A B C D 6 10 2 Installing the side section Refit the components in the reverse order...

Страница 17: ...caling the water Scale deposition increases as the water temperature in creases Descale the water as required 7 3 Check compliance with the local gas group The product s combustion has been factory te...

Страница 18: ...e all burrs from inside of cut pipe work and avoid excessive adhesive which may trap small pockets of water close to the pipe wall which can freeze and build into a larger ice plug For any installatio...

Страница 19: ...red option must not terminate in rain water drain 7 6 1 6 Internal termination downstream of sink waste 100mm 32mm 22mm 3 m Open end of pipe direct into gulley below ground level but above water level...

Страница 20: ...ation The product must be earthed Danger Risk of death from electric shock The power supply terminals L and N remain live even if the product is switched off Switch off the power supply Secure the pow...

Страница 21: ...gap of at least 3 mm at each pole 2 Make sure that the rated voltage of the mains is 230 V 3 Provide one common power supply for the boiler and for the corresponding control Power supply Single phase...

Страница 22: ...multi circuit control Change the pump mode d 18 from Eco intermittent pump operation to Comfort continuous pump opera tion Condition If you are connecting a control 230 V 30 mm N L X1 230V RT Connect...

Страница 23: ...seconds S XX is shown on the display followed by the heat ing flow temperature the internal system pressure and the cylinder temperature depending on the ver sion 2 Press the button to exit this menu...

Страница 24: ...stipulate more stringent requirements the following applies You must treat the heating water in the following cases If the entire filling and supplementary water quantity dur ing the operating life of...

Страница 25: ...over several storeys higher filling pressures may be required to avoid air entering the heating installation If the water pressure falls below 0 05 MPa 0 5 bar the value flashes in the display If the...

Страница 26: ...is intact in accordance with the latest gas safe technical bulletin and informa tion supplied in the installation instructions 2 For extended flue gas installations check for flue gas recirculation u...

Страница 27: ...ck programme P 01 Allow the boiler to cool down by allowing pump overrun to operate for a minimum of two minutes Close the gas stopcock Remove the pressure gauge and retighten the sealing screw 2 for...

Страница 28: ...least 15 minutes 4 Purge the heating installation 5 Activate the display for the current operating mode Page 23 Status codes Overview Page 42 If the product is working correctly the display shows S 0...

Страница 29: ...e Benchmark commissioning checklist located at the rear of this document For IE Complete a Declaration of Conformity to indicate compliance to I S 813 An example of this is given in the current editio...

Страница 30: ...tted front casing Natural gas H Natural gas H CO at full load 9 0 1 0 vol 9 2 1 0 vol CO at full load 250 ppm 250 ppm CO CO 0 0031 0 0031 The value is OK The value is not OK you cannot start up the pr...

Страница 31: ...ing to the following sections 13 Install the two new burner seals 12 7 Cleaning the heat exchanger 1 1 Protect the open electronics box from spraying water 2 Clean the ribs of the heat exchanger 1 wi...

Страница 32: ...ve the float 3 3 Flush out the float and lower section of the siphon with water 4 Fill the lower section of the siphon with water up to 10 mm below the upper edge of the condensate discharge pipe 5 Re...

Страница 33: ...the fault memory using the diagnostics code d 94 2 Set diagnostics code Page 23 Overview of diagnostics codes Page 39 13 4 Resetting parameters to factory settings 1 Reset all parameters to the facto...

Страница 34: ...he gas valve assembly 3 9 Remove the seal 6 if it is still in place on the fan 7 10 Install the new gas valve assembly in reverse order 11 Check the CO content Page 30 12 Set the CO content Page 30 13...

Страница 35: ...bles to the electronics box 13 6 6 Replacing the expansion vessel 1 Drain the product Page 32 B C 1 2 3 A D 2 Undo the nut 3 3 Remove both screws on the support plate 1 4 Remove the support plate 5 Pu...

Страница 36: ...valve 3 Fit the new expansion relief valve with a new O ring 4 Reattach the clip 2 13 6 10 Replace the pressure sensor 1 2 1 Pull out the plug 2 Remove the clip 1 3 Remove the pressure sensor 2 4 Inst...

Страница 37: ...0 If the gas flow rate lies outside of the tolerances specified in these in structions eliminate the fault in accordance with the regulations and the current technology Annually 11 Check the general c...

Страница 38: ...unction If there is a domestic hot water demand the product runs in domestic hot water mode and at maximum heat input If there is no domestic hot water demand the product runs with the partial heat lo...

Страница 39: ...temperature for the domestic hot wa ter cylinder Current value Not adjustable d 08 Status of the 230 V ther mostat Current value 0 Room thermostat open no heat requirement 1 Room thermostat closed hea...

Страница 40: ...3 Status of the heating demand Current value off Heating off Summer mode on Heating on Not adjustable d 24 Status of the pressure monitor 0 1 off Not switched on Switched Not adjustable d 25 Status of...

Страница 41: ...ivated 3 Hot water activated min target value 60 C 0 Adjustable d 60 Number of blocks by the temperature limiter Current value Not adjustable d 61 Number of unsuccessful ignitions Current value Not ad...

Страница 42: ...hermostat Current value off Not connected on Connected Not adjustable d 91 Status DCF77 Current value Not adjustable d 93 Setting the product code 0 99 1 The Device Specific Number DSN can be found on...

Страница 43: ...hot water request blocked S 98 Automatic test programme Return temperature sensor heating and hot water request blocked S 99 Automatic filling active S 108 Purging the combustion chamber fan in operat...

Страница 44: ...ctive F 65 Fault Electronics temperature too high Electronics overheating due to external influences electronics defective F 67 Value sent back by ASIC is incorrect flame signal Implausible flame sign...

Страница 45: ...0 20 16 2 4 11 13 14 18 7 17 8 X51 X51 X20 16 1 9 3 15 4 5 10 11 6 13 X51 X20 X40 X51 X30 X2 X21 X41 X22 X14 L N 24V RT BUS Burner off RT 230Vac X1 FUS X106 X32 X90 X12 X35 RT 230Vac N L X1 X21 4 1 3...

Страница 46: ...and they should be made aware it is ultimately their responsibility to register with the manufacturer within the allotted time period It is essential that the boiler is serviced in line with the manu...

Страница 47: ...eft at factory settings Yes No If no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced...

Страница 48: ...delete as appropriate Date Engineer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions...

Страница 49: ...delete as appropriate Date Engineer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions...

Страница 50: ...pecify how to set boiler to minimum rate contact Technical Helpline for advice CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE With boiler still set at minimum rate insert analyser probe into flue gas s...

Страница 51: ...re curves 28 Flue pipe removing 30 Frost protection 9 G Garantie 6 Gas Council Number 7 Gas flow rate 26 Gas group checking 17 Gas valve assembly replacing 34 Gas air mixture removing 30 H Handing ove...

Страница 52: ...Group UK LTD Nottingham Road Belper Derbyshire DE56 1JQ Telephone 01773 824639 Technical helpline 0330 100 7679 After sales service 0330 100 3142 www glow worm co uk These instructions or parts thereo...

Отзывы: