
0020167175_01 - 02/13 - Glow-worm
7 Appliance
installation
7.1
Scope of delivery
The appliance is delivered in a single carton with a document
pack and
fi
ttings.
i
IMPORTANT:
The
fl
ues package will be ordered according to the
con
fi
guration of the installation.
•
Please check the contents.
1
4.6
2
2.1
2.2
2.3
2.5
2.4
3
4
4.1
4.2
4.3
4.4
4.5
Key
1
Boiler
(x1)
2
Accessories bag
(x1)
2.1 Connection
bag
(x1)
- Heating return valve
(x1)
- Cold water inlet valve
(x1)
-
Heating
fl
ow valve
(x1)
- Domestic hot water connection
(x1)
- Gas isolation valve
(x1)
2.2 Hanging
bracket
(x1)
2.3
Screws and wall plugs bag
(x1)
2.4 Seals
bag
(x1)
- Flat seal ½"
(x2)
- Flat seal ¾"
(x5)
- Flat seal for cold water inlet ¾"
(x4)
2.5 PRV
pipe
(x1)
3
Wall template
(x1)
4
Documents pack
(x1)
4.1
Installation and servicing manual
(x1)
4.2 Flue
book
(x1)
4.3
Instructions for use
(x1)
4.4
Guarantee envelope pack
(x1)
4.5
Magnetic lighting instruction label
(x1)
4.6
Gas conversion label
(x1)
7.2
Recommendations before installing
7.2.1
Domestic hot water circuit design
Water pressure
The minimum working pressure to obtain the maximum domestic
fl
ow is 1,0 bar.
The maximum working pressure of the domestic hot water circuit
is 10 bar. If the cold water supply pressure exceeds this, then a
pressure-reducing valve must be
fi
tted in the supply to the boiler.
‘Hard’ water areas
The temperatures within the heat exchanger are limited by the
boiler control system to minimise scale formation within the hot
water pipework. However, in areas where the water is ‘hard’ (i.e.
more than 200 mg/L of calcium carbonate), it is recommended
that the hot water setting is reduced and that a scale reducer is
fi
tted, refer to the manufacturer’s instructions or consult the local
water company for additional advice.
Domestic water
fl
ow rate
The domestic hot water
fl
ow has a restrictor, factory
fi
tted, which
reduces the
fl
ow to a maximum of:
- 30 : 10/min,
- 35 : 12/min,
Central Heating water
fl
ow rate
If it is necessary to alter the
fl
ow rate, the system can be
fi
tted
with a lockable balancing valve in the main
fl
ow or return pipes.
-
Heating circuit design
5
4
3
2
1
6
7
8
Key
1 Drain
point
2 External
bypass (if required)
3 Domestic hot water out
4 Domestic cold water supply in
5 Boiler
6 Additional expansion vessel (if required)
7 Heating return circuit
8 Heating
fl
ow circuit
9 Optional
balancing
valve
INSTALLATION
- 9 -
Содержание ULTIMATE 30c
Страница 1: ...condens Installation and Servicing ULTIMATE 30c G C No 47 044 48 ULTIMATE 35c G C No 47 044 49...
Страница 2: ......
Страница 51: ...Declaration of Conformity Installation Commissioning and Service Record...
Страница 52: ...a...
Страница 54: ......
Страница 55: ......