Glow-worm ENERGY 25c Скачать руководство пользователя страница 7

Notes on the documentation 2

0020177746_03 ENERGY Installation and maintenance instructions

7

2

Notes on the documentation

2.1

Observing other applicable documents

You must observe all the operating and installation in-
structions included with the system components.

2.2

Storing documents

Pass these instructions and all other applicable docu-
ments on to the system operator.

2.3

Validity of the instructions

These instructions apply only to:

Product article number

Article number

Gas Council
Number

ENERGY 25c -A (H-
GB)

0010015652

47-019-24

ENERGY 30c -A (H-
GB)

0010015653

47-019-25

ENERGY 35c -A (H-
GB)

0010015654

47-019-26

2.4

Benchmark

Glow-worm is a licensed member of the Benchmark
Scheme.

Benchmark places responsibilities on both manufacturers
and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the
manufacturer’s instructions by a competent person approved
at the time by the Health and Safety Executive and that it
meets the requirements of the appropriate Building Regu-
lations. The Benchmark Checklist can be used to demon-
strate compliance with Building Regulations and should be
provided to the customer for future reference.

Installers are required to carry out installation, commission-
ing and servicing work in accordance with the Benchmark
Code of Practice which is available from the Heating and
Hotwater Industry Council who manage and promote the
Scheme.

Benchmark is managed and promoted by the Heating and
Hotwater Industry Council.

For more information visit www.centralheating.co.uk

3

Product description

3.1

Compartment Ventilation

The boilers are very high efficiency appliances.

As a consequence the heat loss from the appliance casing
during operation is very low.

Compartment ventilation is not required as the products are
only certified, and can only be fitted with a concentric flue
system.

3.2

Information on the identification plate

The identification plate is mounted on the underside of the
product in the factory.

The identification plate keeps record of the country in which
the product is to be installed.

Information on the
identification plate

Meaning

Barcode with serial number

Serial number

For quality control purposes; 3rd and 4th
digits = year of production
For quality control purposes; 5th and 6th
digits = week of production
For identification purposes; 7th to 16th
digits = product article number
For quality control purposes; 17th to 20th
digits = place of manufacture

ENERGY ..c

Product description

2H, G20

2.0 kPa

(20 mbar)

Factory setting for type of gas and gas
connection pressure

Cat.

Approved gas category

Condensing techno-
logy

Efficiency class of the boiler in accord-
ance with EC Directive 92/42/EEC

Type: Xx3(x)

Permissible flue gas connections

PMS

Maximum water pressure in heating
mode

PMW

Maximum water pressure in hot water
handling mode

V/Hz

Electric connection

W

Max. electrical power consumption

IP

Level of protection

Heating mode

Hot water generation

P

n

Nominal heat output range in heating
mode

P

nc

Nominal heat output range in heating
mode (condensing technology)

P

Nominal heat output range in hot water
handling mode

Q

n

Nominal heating load range in heating
mode

Q

nw

Nominal heating load range in hot water
handling mode

T

max.

Max. flow temperature

NOx

NOx class for the product

Code (DSN)

Specific product code

Содержание ENERGY 25c

Страница 1: ...Installation and main tenance instructions ENERGY 25c 30c 35c GB IE...

Страница 2: ...cuit 18 7 10 Checking and adjusting the gas settings 18 7 11 Checking leak tightness 20 8 Adapting the unit to the heating installation 21 8 1 Burner anti cycling time 21 8 2 Setting the pump output 2...

Страница 3: ...ation and maintenance instructions 3 J Pipe lengths for the air flue pipe 46 J 1 Length of the C13 type air flue pipe 46 J 2 Length of the C33 type air flue pipe 46 J 3 Length of the C43 type air flue...

Страница 4: ...the other applicable documents Intended use includes the following observance of accompanying operating installation and servicing instructions for the product and any other system compon ents install...

Страница 5: ...there is no voltage 1 4 6 Risk of death due to lack of safety devices The schematic drawings included in this doc ument do not show all safety devices re quired for correct installation Install the ne...

Страница 6: ...NERGY 0020177746_03 1 4 12 Risk of material damage caused by using an unsuitable tool Use the correct tool to tighten or loosen threaded connections 1 5 Regulations directives laws standards Observe t...

Страница 7: ...ion visit www centralheating co uk 3 Product description 3 1 Compartment Ventilation The boilers are very high efficiency appliances As a consequence the heat loss from the appliance casing during ope...

Страница 8: ...exceeds the weight that can be lifted by a single person 4 1 1 General Hold the load as close as possible to your body Avoid rotational movements Instead reposition your feet If the unit is being lift...

Страница 9: ...clearances C C A B D Minimum clearance A 150 mm top air flue gas connection 20 mm air flue gas connection on the rear B 150 mm C 5 mm 70 mm if the side panels ought to be removed D 600 mm It is not n...

Страница 10: ...centre so that the latching lug is released 3 Pull the front casing forwards at the bottom edge 4 Lift the front casing upwards from the bracket 4 8 2 Installing the front casing Refit the components...

Страница 11: ...causes corro sion in the heat generator circuit and in the product If you use non diffusion tight plastic pipes in the heating installation ensure that no air gets into the heat generator circuit Cau...

Страница 12: ...nate at a suitable drain point within the heated envelope of the building that will remain frost free under long periods of low external temperatures Connect the condensate traps 1 Use the supplied dr...

Страница 13: ...n 100mm L 3m max 19mm min 30mm 5 4 1 7 External termination into rain water down pipe 19mm min 30mm 5 5 Electrical installation Danger Risk of death from electric shock The power supply terminals L an...

Страница 14: ...valid regulations 2 Make sure that the rated voltage of the mains is 230 V 3 Provide one common electricity supply for the boiler and for the corresponding controller Power supply Single phase 230 V 5...

Страница 15: ...old the button for 7 seconds is shown in the display 2 Press the or button to set the value The access code 96 is reserved for the competent person The access code 35 is reserved for the customer serv...

Страница 16: ...t The first commissioning checklist in the appendix Page 42 of the installation instructions must be filled out and stored carefully along with the unit s documentation Carry out the initial start up...

Страница 17: ...m of 8 5 Caution Risk of material damage if the heating water is treated with unsuitable additives Unsuitable additives may cause changes in the components noises in heating mode and possibly subseque...

Страница 18: ...P 07 and then P 06 Check programmes Overview Page 30 7 8 Filling the condensate siphon C 2 3 1 A B 1 Unclip the lower section of the siphon 1 from the up per section of the siphon 2 2 Remove the floa...

Страница 19: ...the boiler operating at full load check that the gas inlet working pressure at the reference test point 2 complies with the requirements Permissible connection pressure Great Bri tain Natural gas G20...

Страница 20: ...bar in any installation If the system is to be treated with an inhibitor it should be applied at this stage in accordance with the manufacturer s instructions Further information can be obtained from...

Страница 21: ...sts independently to the hydraulic conditions of the heating installation If you have installed a low loss header in the heating install ation you should switch off the speed regulation and set the pu...

Страница 22: ...4 Setting the hot water temperature Danger Risk of death from legionella Legionella multiply at temperatures below 60 C Ensure that the end user is familiar with all of the Anti legionella measures i...

Страница 23: ...a stable value 5 min 1 3 Unscrew the cover from the flue gas analysis point 1 4 Measure the CO content at the flue gas analysis point 1 5 Compare the measured value with the corresponding value in the...

Страница 24: ...e the flue gas pipe 2 3 4 5 A B 7 Remove the air intake pipe 3 8 Remove the plugs from the gas valve 4 and from the fan 5 A C D B 6 9 Remove the gas air mixture unit 6 7 7 8 10 Remove the burner seals...

Страница 25: ...1 from the up per section of the siphon 2 2 Remove the float 3 3 Flush out the float and lower section of the siphon with water 4 Fill the lower section of the siphon with water up to 10 mm below the...

Страница 26: ...If you are unable to clear the fault code and it reappears despite several fault clearance attempts contact cus tomer service 11 2 Calling up the fault memory The last 10 fault codes are stored in the...

Страница 27: ...move the clip underneath the condensate tray 1 12 Undo the four screws 2 2 1 B C A 13 Remove the ignition electrode 1 14 Lift the heat exchanger up slightly and remove it to gether with the condensate...

Страница 28: ...Open the electronics box 2 Pull all of the plugs out from the PCB 3 Undo the clips on the PCB 4 Remove the PCB 5 Install the new PCB in such a way that it clicks into the groove at the bottom and int...

Страница 29: ...the clip 1 3 Remove the pressure sensor 2 4 Install the new pressure sensor 5 Reattach the clip 1 11 7 Checking the product for leak tightness Check that the product is leak tight Page 20 12 Decommis...

Страница 30: ...P 06 Purging the heating circuit The diverter valve is moved to the heating position The function is activated in the heating circuit for 15 minutes The pump runs and stops at regular intervals If req...

Страница 31: ...justable d 14 Operating mode of the modulating pump 0 5 0 variable rotational speed auto 1 2 3 4 5 Fixed rotational speeds Section Setting the pump output 0 Adjustable d 15 Pump speed Current value No...

Страница 32: ...functional module 1 10 1 Circulation pump 2 External pump 3 Cylinder charging pump 4 Extractor hood 5 External solenoid valve 6 Fault display 7 Solar pump omitted 8 eBUS remote control 9 Legionella p...

Страница 33: ...70 Operation of the diverter valve 0 2 0 Normal operating mode DHW and heating mode 1 Mid position parallel opera tion 2 Permanent heating mode position 0 Adjustable d 71 Maximum heating flow set targ...

Страница 34: ...ion S 04 Heating mode Burner on S 05 Heating mode Pump fan overrun S 06 Heating mode Fan overrun S 07 Heating mode Pump overrun S 08 Heating mode Temporary shutdown after heating procedure Displays in...

Страница 35: ...n or has come loose multiple plug on the PCB not plugged in correctly interruption in cable harness NTC sensor defective F 10 Short circuit Flow temperature sensor NTC sensor defective short circuit i...

Страница 36: ...t range coding resistance F 71 Fault Flow return temperature sensor Flow temperature sensor signalling constant value Flow temperature sensor incorrectly positioned on supply pipe flow temperature sen...

Страница 37: ...RT BUS Burner off RT 230Vac X1 FUS X106 X32 X90 X12 X35 X1 L N RT 230Vac X35 4 1 3 2 eBUS RT 24V Burner off X106 1 3 4 1 3 3 1 2 M 1 3 4 6 1 2 3 M 5 4 2 1 2 1 2 1 N L L 24V 230V 24V 230V 2 7 8 9 10 12...

Страница 38: ...30Vac 4 3 1 2 eBUS RT 24V Burner off X106 X35 1 3 4 1 3 3 1 2 M 1 3 4 6 1 2 3 M 4 3 2 1 5 4 2 1 5 6 7 8 2 1 2 1 N L L X35 24V 230V 24V 230V 2 7 8 9 10 12 11 1 4 5 6 14 13 3 1 Main PCB 2 Interface PCB...

Страница 39: ...ry approx 0 03 MPa 0 3 bar below the system filling pressure X 9 Remove the gas air mixture unit X 10 Check the seals in the combustion area If you see any damage replace the seals Replace both burner...

Страница 40: ...ter pipes 75 mm E Below eaves 200 mm F Below balconies or car port roofs 200 mm G From vertical wastewater pipes or down pipes 150 mm H From external or internal corners 200 mm I Above floors roofs or...

Страница 41: ...s manual 1 Dimensions D E F and G These clearances may be reduced to 25 mm without affecting the performance of the boiler In order to ensure that the con densate plume does not affect adjacent surfac...

Страница 42: ...ENERGY 0020177746_03 I Commissioning Checklist Heating and Hotwater Industry Council HHIC www centralheating co uk Benchmark Commissioning and Servicing Section It is a requirement that the boiler is...

Страница 43: ...the appropriate Building Regulations and then handed to the customer to keep for future reference GAS BOILER SYSTEM COMMISSIONING CHECKLIST CONTROLS Optimum start control Fitted Fitted Fitted Fitted A...

Страница 44: ...ystem is serviced regularly and that the appropriate Service Interval Record is completed Service Provider SERVICE RECORD SERVICE 01 AND AND SERVICE 02 AND AND SERVICE 03 AND AND SERVICE 04 AND AND SE...

Страница 45: ...to set boiler to minimum rate contact Technical Helpline for advice CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE With boiler still set at minimum rate insert analyser probe into flue gas sampling poi...

Страница 46: ...80 125 L C33 type air flue pipe C33 type air flue pipe ENERGY 25c A H GB 10 m 25 m ENERGY 30c A H GB 10 m 25 m ENERGY 35c A H GB 10 m 25 m J 3 Length of the C43 type air flue pipe Applicability C43 ty...

Страница 47: ...m heat input heat ing Q min 5 1 kW 6 1 kW 7 2 kW Maximum heat input hot water Q max 25 7 kW 30 6 kW 35 7 kW Minimum heat input hot water Q min 5 1 kW 6 1 kW 7 2 kW Technical data Domestic hot water EN...

Страница 48: ...min 34 35 37 Flue gas temperature in hot water handling mode 69 68 75 Flue gas temperature when over heating 105 95 104 Released system types C13 C33 C43 C13 C33 C43 C13 C33 C43 Nominal efficiency at...

Страница 49: ...p output 21 I Identification plate 7 If you smell flue gas 5 If you smell gas 4 Inspection work 22 39 Installation site 5 Intended use 4 L Leak tightness 20 26 29 M Maintenance work 22 39 Minimum clea...

Страница 50: ......

Страница 51: ......

Страница 52: ...73 824639 Technical helpline 0330 100 7679 After sales service 0330 100 3142 www glow worm co uk 0020177746_03 16 11 2017 These instructions or parts thereof are protected by copyright and may be repr...

Отзывы: