Glow-worm Compact 24c-AS/1 H-GB Скачать руководство пользователя страница 26

9 Start-up

26

Installation and maintenance instructions MicraCom 0020289288_02

9.4

Purging the heating installation

1.

Start the check programme

P.00

(

Page 24)

Check programmes (

Page 48)

on

is shown in the display.

2.

Make sure that the filling pressure of the heating install-
ation does not fall below the minimum filling pressure.

– ≥

0.05 MPa (

0.50 bar)

3.

Check whether the filling pressure of the heating in-
stallation is at least 0.02 MPa (0.2 bar) above the dia-
phragm expansion vessel's counter-pressure (P

system

P

diaphragm expansion vessel

+ 0.02 MPa (0.2 bar)).

Result:

Filling pressure of the heating installation is too low

Refill the heating installation.

4.

If there is still too much air in the heating installation at
the end of the check programme

P.00

, restart the check

programme.

9.5

Filling and purging the domestic hot water
system

1.

Open the cold-water isolation valve on the product.

2.

To fill the domestic hot water circuit, open all of the do-
mestic hot water tap fittings until water escapes.

9.6

Check and gas setting

9.6.1

Checking the factory-set gas setting

Check the information about the gas type indicated on
the data plate and compare this with the gas type avail-
able at the installation site.

Result 1:

The product design is not compatible with the local gas
group.

Do not start up the product.

Contact customer service.

Result 2:

The product design is compatible with the local gas
group.

Check the gas connection pressure/gas flow pres-
sure. (

Page 26)

Check the CO

content. (

Page 28)

9.6.2

Checking the air/flue pipe/flue gas
recirculation

1.

Check the flue gas installation is intact in accordance
with the latest gas safe technical bulletin and informa-
tion supplied in the installation instructions.

2.

For extended flue gas installations check for flue gas
recirculation using the air analysis point.

3.

Use a flue gas analyser.

4.

If you discover unusual levels of CO or CO

2

in the sup-

ply air, search for the leak in the flue system or for signs
of flue gas recirculation.

5.

Eliminate the damage properly.

6.

Check again whether the supply air contains any unusal
levels of CO or CO

2

.

7.

If you cannot eliminate the damage, do not start up the
product.

9.6.3

Checking the gas flow rate

The boiler is fitted with a multifunctional automatic gas valve
which ensures that the precise air/gas ratio is provided un-
der all operating conditions. The gas flow rate has been set
during production and does not require adjustment. With the
front casing fitted check the gas flow rate of the boiler as fol-
lows:

Start up the product with the check programme

P.01

.

In addition, ensure that maximum heat can be dissipated
into the heating system by turning up the room thermo-
stat.

Wait at least 5 minutes until the boiler has reached its
operating temperature.

Ensure that all other gas appliances in the property are
turned off.

Measure the gas flow rate at the gas meter.

Compare the measured values with the corresponding
values in the table.

Validity:

MicraCom 24c-AS/1 (H-GB)

Qnw from
the data
plate

H gas in m

³

/h

P gas in m

³

/h

Nom.

+5%

10%

Nom.

+5%

10%

6.2

0.65

0.68

0.59

8.4

0.34

0.36

0.31

18.8

1.98

2.08

1.78

0.77

0.81

0.69

24

2.53

2.66

2.28

0.98

1.03

0.88

Validity:

MicraCom 28c-AS/1 (H-GB)

Qnw from
the data
plate

H gas in m

³

/h

P gas in m

³

/h

Nom.

+5%

10%

Nom.

+5%

10%

7.2

0.76

0.80

0.68

0.29

0.30

0.26

24.5

2.58

2.71

2.32

1.00

1.05

0.90

28

2.95

3.10

2.66

1.15

1.21

1.04

Condition

: Gas flow rate not in the permissible range

Check all of the piping and ensure that the gas flow rates
are correct.

Only put the product into operation once the gas flow
rates have been corrected.

Condition

: Gas flow rate in the permissible range

End check programme

P.01

.

Allow the boiler to cool down by allowing pump overrun to
operate for a minimum of two minutes.

Record the boiler maximum gas flow rate onto the
Benchmark gas boiler commissioning checklist.

9.6.4

Checking the gas connection pressure/gas
flow pressure

1.

Temporarily decommission the product. (

Page 39)

2.

Hinge the electronics box downwards.

Содержание Compact 24c-AS/1 H-GB

Страница 1: ...Installation and main tenance instructions MicraCom 24c AS 1 28c AS 1 GB IE...

Страница 2: ...Start up 24 9 1 Carrying out the initial start up 24 9 2 Checking and treating the heating water filling and supplementary water 24 9 3 Filling the heating installation 25 9 4 Purging the heating inst...

Страница 3: ...w The following work must only be carried out by competent persons who are sufficiently qualified to do so Set up Dismantling Installation Start up Inspection and maintenance Repair Decommissioning Pr...

Страница 4: ...sufficient in accordance with the relevant ventilation requirements This also applies in particular for cupboard installa tions To prevent corrosion on the product and in the flue system Ensure that t...

Страница 5: ...eat generator circuit 1 3 9 Neutralisation device To prevent contamination of the waste water Check whether a neutralising unit must be installed in accordance with national regulations Observe local...

Страница 6: ...enquiries vaillant group com Spares Enquiries Telephone 01773 881383 To register your Glow worm appliance visit Glow worm is a licensed member of the Benchmark Scheme Benchmark places responsibilitie...

Страница 7: ...w at 15 C and 1013 mbar based on domestic hot water generation G31 1 86 kg h 2 18 kg h Permissible installation types C13 C33 C43 C53 C13 C33 C43 C53 Nominal efficiency in partial load mode 30 107 8 1...

Страница 8: ...l Technical data Domestic hot water 24c AS 1 28c AS 1 Minimum water flow 1 7 l min 1 7 l min Specific flow rate D T 30 K 11 5 l min 13 4 l min Specific flow rate D T 35 K 9 9 l min 11 5 l min Permissi...

Страница 9: ...ation of the central heating If the boiler does not resume normal operation reset the boiler If the boiler does not resume normal operation after this call your Installation Servicing company or Glow...

Страница 10: ...Maximum heat output in domestic hot water generation mode Qnw Maximum heat input in domestic hot water generation mode Hi Lower gross calorific value Barcode with serial number 3rd to 6th digits produ...

Страница 11: ...ducts are only certified and can only be fitted with a concentric flue system 6 5 Air flue pipe 6 5 1 Regulation Different flue outlet configurations can be carried out Consult the installation manual...

Страница 12: ...is required if persons could come into con tact with the terminal or the terminal could be subject to dam age If a terminal guard is required it must be positioned to provide minimum of 50 mm clearanc...

Страница 13: ...clearance to noncombustible building material Vertical flue clearance to combustible building material 500 mm 1 500 mm J Above below and either side of an opening door air vent or opening window 300 m...

Страница 14: ...distance of the terminal 2 These dimensions comply with the building regulations but they may need to be increased to avoid wall staining and nuisance from pluming depending on site conditions Termina...

Страница 15: ...nance instructions 15 Balcony eaves Gutter Adequately secured air flue gas pipe The flue pipe must protrude beyond any overhang You can use a plume management kit to enable the termination point to be...

Страница 16: ...ing 1 elbow 0 3 m including 1 elbow Max length L 16 m including 1 elbow 20 m including 1 elbow Max height H 2 10 m 2 10 m Equivalence to 1 elbow 90 2 5 m 2 5 m Equivalence to 1 elbow 45 1 m 1 m 6 5 4...

Страница 17: ...m Each time an additional 90 bend is necessary or 2 at 45 the length L must be reduced see table below 60 100 24c AS 1 28c AS 1 Min length L 0 3 m 0 3 m Max length L 3 m 3 elbow 3 m 3 elbow 60 100 24c...

Страница 18: ...pipes if they have not yet been connected to the product 7 1 Requirements 7 1 1 Carrying out basic preparation for the installation 1 Make sure that the existing gas meter is capable of passing the r...

Страница 19: ...phon may be drained fully and flue gas may escape Have the condensate discharge hose end outside of the waste water pipework A B 1 Follow the instructions listed here and observe the legal and local r...

Страница 20: ...tube 5 Limestone chippings 6 Hole depth 400 mm minimum Least preferred option must not terminate in rain water drain 7 5 6 Internal termination downstream of sink waste 100mm 32mm 22mm 3 m Open end of...

Страница 21: ...out which air flue pipes may be used by consulting the enclosed set up instructions for the air flue system Condition Installation in damp rooms Connect the product to a room sealed air flue system T...

Страница 22: ...grommet is plugged in correctly and that the cables have been routed correctly 3 Ensure that the grommets envelop the connection cables tightly and with no visible gaps 4 Use the strain reliefs 5 If r...

Страница 23: ...ntrol 24 V ON OFF 3 eBUS control or radio receiver unit 4 Outdoor temperature sensor wired 5 eBUS control or radio receiver unit 1 Carry out the wiring Page 22 2 Alternatives 1 Connecting the weather...

Страница 24: ...start up Initial start up must be carried out by a customer service technician or an authorised competent person using the Benchmark Checklist The Benchmark Checklist in the ap pendix Page 50 of the i...

Страница 25: ...ed the above mentioned additives inform the end user about the measures that are required Inform the end user about the measures required for frost protection 9 3 Filling the heating installation Note...

Страница 26: ...2 in the sup ply air search for the leak in the flue system or for signs of flue gas recirculation 5 Eliminate the damage properly 6 Check again whether the supply air contains any unusal levels of CO...

Страница 27: ...1 kPa 1 mbar lower than the minimum value spe cified in the table Result 1 Gas connection pressure gas flow pressure in the per missible range Temporarily decommission the product Page 39 Hinge the el...

Страница 28: ...instead report this to customer service Result 2 If the value is inside the permitted range Continue with the process of starting up the product 6 Remove the sensor for the CO analyser and close the...

Страница 29: ...he system is to be treated with an inhibitor it should be applied at this stage in accordance with the manufacturer s instructions See the section on checking and preparing the heating water Page 24 8...

Страница 30: ...Notes application Right hand stop turned all the way down 0 035 MPa 0 350 bar If the radiators do not heat up sufficiently at the factory setting In this case you must set the pump to the maximum spee...

Страница 31: ...off the guarantee documentation 12 Inspection and maintenance Adhere to the minimum inspection and maintenance in tervals Carry out maintenance work on the product at an earlier point if the results...

Страница 32: ...the expansion vessel to the maintenance position 12 3 Moving the expansion vessel to the maintenance position on the hydraulic block A C A B D Depending on the components on which you want to work mo...

Страница 33: ...sts of four main components Gas valve assembly Venturi and restrictor for the reference pressure pipe Burner flange Premix burner 1 Never remove the venturi from the burner flange x4 3 5 4 2 1 6 2 Rem...

Страница 34: ...iphon 3 Check the insulating mat 3 on the burner flange for damage Result Insulating mat damaged Replace the insulating mat Spare parts instruc tions for the heat exchanger insulating mat 12 4 4 Check...

Страница 35: ...5 0 5 mm 6 Replace the seal 3 7 Install the electrode To do this proceed in reverse or der 12 4 7 Checking and cleaning the restrictor for the reference pressure pipe 0 23 D 65 150 A B C E 1 2 3 1 Rem...

Страница 36: ...ng filter under running water against the direction of flow 7 If the strainer is damaged or it can no longer be cleaned sufficiently you must replace the strainer 8 Use only new seals 9 Reinsert the h...

Страница 37: ...ge 44 Press and hold the button for longer than three seconds to reset the product maximum five times rE is shown in the display rE flashes rapidly after five reset attempts Press to stop the flashing...

Страница 38: ...starting the product carry out a leak tightness test check the CO content and if required adjust this 13 4 4 Replacing the fan 1 Move the expansion vessel to the maintenance position on the combustion...

Страница 39: ...Press the on off button The display shows oF and then goes out 3 Disconnect the product from the mains power 4 Close the gas stopcock 5 Close the stopcock on the cold water connection 15 Recycling an...

Страница 40: ...charge pressure of the expansion vessel at regular intervals 35 12 Removing the compact thermal module at regular intervals 33 13 Cleaning the heat exchanger at regular intervals 34 14 Checking the b...

Страница 41: ...nt value Hi 100 d 16 Status of the 24 V room thermostat ON OFF Current value OF Heating off on Heating on or eBUS control used d 17 Heating control 0 Flow temperature 1 Return temperature adjustment f...

Страница 42: ...ent 100 Fan speed Display value x 1000 flashing 1000 1 0 x 1000 d 58 Solar circuit reheating 0 3 Applies to Installed solar set optional 0 Product s anti legionella function deactivated 3 Domestic hot...

Страница 43: ...ner for heating mode is activated S 05 The pump and fan overrun for heating mode is activated S 06 The fan overrun for heating mode is activated S 07 The pump overrun for heating mode is activated S 0...

Страница 44: ...rat ure sensor Flow temperature sensor de fective Replace the flow temperature sensor Multiple plug loose not plugged in Check the multiple plug and plug connection Interruption in the cable harness C...

Страница 45: ...ion location of the non return valve F 25 Safety shutdown Flue gas tem perature too high Flue gas safety cut out plug is not plugged in or is loose Check the plug and the plug connection Interruption...

Страница 46: ...PCB Temperature sensors defective or not connected correctly Ensure that the electrical connection for the temperature sensors has been established correctly that they are not corroded and that they...

Страница 47: ...w temperature sensor F 72 Fault Return temperature sensor Flow temperature sensor de fective Replace the flow temperature sensor Return temperature sensor de fective Replace the return temperature sen...

Страница 48: ...assembly Short circuit in the cable har ness Check the cable harness F 89 Fault Pump Pump not connected Check the pump connection Pump connected incorrectly Check the pump connection Incorrect pump co...

Страница 49: ...4V 230V 24V 230V 2 12 13 14 16 1 8 9 10 11 15 17 18 17 3 4 5 6 X32 eBUS 1 3 2 4 7 1 Main PCB 2 PCB for the control element 3 Limit thermostat with contact for underfloor heating Burner off optional 4...

Страница 50: ...umer and they should be made aware it is ultimately their responsibility to register with the manufacturer within the allotted time period It is essential that the boiler is serviced in line with the...

Страница 51: ...ut left at factory settings Yes No If no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalan...

Страница 52: ...ILER delete as appropriate Date Engineer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructi...

Страница 53: ...ILER delete as appropriate Date Engineer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructi...

Страница 54: ...d purging the product 25 Filling the condensate siphon with water 19 Filling the expansion vessel 35 G Garantie 6 Gas group 18 Gas type 18 H Handing over to the end user 30 Heating filter cleaning 36...

Страница 55: ......

Страница 56: ...1JQ Telephone 01773 824639 Technical helpline 0330 100 7679 After sales service 0330 100 3142 www glow worm co uk These instructions or parts thereof are protected by copyright and may be reproduced...

Отзывы: