![Glow-worm Betacom 24c Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/glow-worm/betacom-24c/betacom-24c_installation-and-servicing_2234490031.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
31
9 Vertical Flue - Length, Preparation and Installation
Diagram 9.20
14529
Diagram 9.21
14528
Diagram 9.22
12982
9.15 Completion of Installation
With the flue terminal positioned in the roof the length of the
final pipe can be determined. If a telescopic length cannot
be used, then a standard flue length can be cut to make the
correct length. Cut the flue to the desired length measuring
from the ‘O’ ring end and discard the plain end of the tube.
The cuts must be square and made free of burrs to allow
correct assembly.
NOTE
: The flue pipe is 10mm longer than the air pipe, see
diagram 9.23.
Carefully push the terminal assembly upwards to allow room
for fitting the final flue piece. Fit a fixing bracket to the terminal
assembly. Pull the terminal assembly down and join to the flue
system. Ensure that the terminal is making a weather tight
seal on the weather collar. Secure the fixing bracket fitted to
the terminal to the roofing struts or a purpose made batton.
Diagram 9.23
12983