Then connect the channel rails to the square construction with the couplers provided as per the following
image.
Now it is time to lift the roof up and to connect it with the legs. The vertical legs must have the couplers at the
bottom, the tops must then be inserted in to the roof construction and secured with the pins and R-clips.
When this is done, the stage platforms (not included) can be placed inside the FOH construction and connected
with each other. The four round platform legs (included) are for use on the outer corners of the 3 x 2m platform.
Now attach the FOH construction with the two couplers on each leg with the round legs of the platform.