Step 5: Place the Anchor Sleeve in the cut out area, make sure that the front of the
Anchor Sleeve is 12” to 17” from the water’s edge. (refer to overview) A key element
is to make sure that the Anchor Sleeve is level and square with the pool so that your
Superior Series Lift sits properly on the deck.
Step 6: Bonding the unit – The binding screw is supplied with the Anchor Sleeve
locate the binding screw, connect the binding screw to the bonding grid.
NOTE: Make sure that all local codes and ordinances are met.
Step 7: Pouring your concrete, (make sure you cover the hole on your anchor sleeve
with the plastic cap provided, so you don’t get concrete in the sleeve) a minimum of
4,000 psi concrete with reinforcing rod. Also make sure that the top of the anchor
sleeve is flush with the deck. Before you install your lift make sure you let the
concrete set up for 48 hours.
Step 8: After the concrete has set for 48 hours, now it’s time to install your lift. Place
your Superior Series Lift over the anchor sleeve, once you have completed the
installation, please refer to User’s Manual for a safe operation.
FEB 2012
Superior New Construction/Saw Cut
Anchor