10
DOK4x HOIAO CxDEN · FD 9912
www.gdts.one
English
Air-to-water heat pump 16 kW with domestic hot water
After the final positioning at the installation location, remove
the transport fastening on the sprung floor of the compressor
on both sides.
!!
ATTENTION!
Before commissioning, the transport fastening must be re-
moved.
4.3 Domestic hot water cylinder
A pallet should be used to transport the heat pump to its final
installation location.
To lift from the pallet, the cylinder can be tilted back and lifted
by the handles on the back at the top and on the front at the
bottom.
The front wall of the cylinder can be removed for maintenance
work. For this, loosen the two screws on the front at the bottom,
push the front panel upwards approx. 10 mm and remove to
the front
1.
1.
2.
3.
Содержание 16CHOIAOC6
Страница 2: ......