gledhill BMA 215 OV-SOL Скачать руководство пользователя страница 46

Page 46

TERMS AND C

ONDITIONS

Gledhill

 (Water Storage) 

Ltd

AMD. JUNE 2008

CONDITIONS OF SALE & GUARANTEE TERMS

1.

Gledhill (Water Storage) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear below 

and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us to 
the exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and 
Warranty Terms override those which are contained on the Invoice Forms and all Sales are now subject to these 
Conditions of Sale and Warranty terms only.
2.

PRICE

Once an order or call off has been accepted the price will be held for three months but if delivery is extended 
beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.
  
The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.
3.

SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with our 
printed  literature  or  the  literature  of  any  of  our  component  suppliers  (subject  to  any  modifications  made  since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.
4.

PAYMENT

The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due date we 
will allow an appropriate settlement discount except where we have quoted a special net price.  If payment is not 
received in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 

(ii)

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5.

TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.
6.

DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk and 
expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had been 
despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.
7.

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.
8.

RETURN OF GOODS

Goods  may  not  be  returned  to  the  Company  except  by  prior  written  permission  of  an  authorised  officer  of  the 
Company  and  such  return  shall  be  subject  to  payment  by  the  Purchaser  of  handling  and  re-stocking  charges, 
transport and all other costs incurred by the Company.
9.

COMPANY LIABILITY AND GUARANTEE

9.1. Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2. Each Guarantee is strictly conditional upon the following:-
9.2.1. Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2. The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3. All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4. The unit has only been used for the storage of potable water supplied from the public mains.
9.2.5 Where  appropriate  the  unit  has  been  regularly  maintained  as  detailed  in  the  installation  and  service 

instructions

9.2.6. Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7. Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.3. Guarantees are provided in respect of specified goods supplied by Gledhills as follows:-

(a) Domestic and Commercial Open Vented Cylinders and Tanks.
The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.
(i)    free of all charge during the first year after delivery by us.
(ii) thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b) Domestic Mains Fed Products [Primary Stores]
The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel  assembly  proves  to  be  defective  either  in  materials  or  workmanship,  we  reserve  the  right  to  either 
repair or supply replacements or the closest possible substitute in the case of any obsolete product and will 
collect and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).
(i) free of all charge during the first year after delivery by us.
(ii) thereafter  at  a  charge  of  one-fifth  of  the  then  current  list  price  or  any  copper  price  supplement  and 

delivery charge during the second year after delivery by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

(c) Integrated Boiler and Storage Vessel Products and Stand Alone Boilers
In the case of the GulfStream range of products and the Gledhill boiler range of products,  Gledhill guarantees 
the heat exchanger (boiler) for material and construction faults for two years.  THE RESPONSIBILITY FOR THE 
EXECUTION OF THIS GUARANTEE LIES WITH THE INSTALLER.
The guarantee becomes null and void if the appliance is used incorrectly, or in the event of proven negligence 
or  incorrectly  implemented  repairs  OR  FAILURE  TO  CARRY  OUT  THE  RECOMMENDED  INSPECTION/
MAINTENANCE
.  The guarantee also becomes null and void if changes are made to the appliance without our 
knowledge, or if the serial number on the appliance is removed or made illegible.

The annual service must be carried out by a competent 
installer  in  accordance  with  the  advice  given  by 
Gledhill and using Gledhill approved parts.
(d) Stainless Steel Unvented Cylinders
Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED  TEMPERATURE  AND  PRESSURE  RELIEF  VALVE 
MUST  NOT  BE  REMOVED  OR  ALTERED  IN  ANY  WAY 
OR THE GUARANTEE WILL NOT BE VALID.  GLEDHILL 
WILL NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL 
LOSS OR DAMAGE HOWEVER IT IS CAUSED. 
The  guarantee  for  the  stainless  steel  vessel  is  for 
twenty five years if the original unit is returned to us 
AND PROVIDED THAT:
(i) It has been installed as per the Design, Installation 

&  Servicing  Instructions,  relevant  standards, 
regulations and codes of practice.

(ii) It has not been modified, other than by Gledhill.
(iii) It  has  not  been  subjected  to  wrong  or  improper 

use or left uncared for.

(iv) It  has  only  been  used  for  the  storage  of  potable 

water.

(v) It has not been subjected to frost damage.
(vi) The benchmark log book is completed after each 

annual service.

(vii) The unit has been serviced annually.
It should be noted that the guarantee does not cover:
-

the effects of scale build up

-

any labour charges associated with replacing the 
unit or  parts.

If  the  stainless  steel  vessel  proves  to  be  defective 
either  in  materials  or  workmanship  we  reserve  the 
right  to  either  repair  or  supply  replacements  or  the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):
(i) free of charge during the first year after delivery by us.
(ii) thereafter  at  a  charge  of  one  twenty  fifth  of  the 

then  current  list  price  during  the  second  year 
after  delivery  by  us  and  increasing  by  a  further 
one  twenty  fifth  on  the  second  and  subsequent 
anniversary of delivery by us.

ACTION IN THE EVENT OF FAILURE
If  the  stainless  steel  cylinder  develops  a  leak  we  will 
ask for a deposit against the supply of a new one.  This 
will be refunded if the failure is within the terms of the 
warranty when it has been examined by us.
(e) Solar Panels and ancillary equipment
Gledhill  provides  a  five  year  warranty  for  defects  in 
the  collectors  (except  broken  glass  and  collector 
accessories  eg  metal  edgings).    If  the  collector 
demonstrably fails to meet one of the requirements of 
the standard DIN 4757 part 3 we will replace it free of 
charge based on the date of invoice.  We can not be 
responsible for damage caused by mechanical stress 
and/or changes caused by weather related influences.  
The  warranty  excludes  minor  surface  damage  that 
does  not  affect  performance  or  malfunction  due  to 
improper assembly or installation.
Please note:
-

Installation  must  have  been  carried  out  by  a 
licensed specialized company (heating contractor 
or  plumber)  following  the  version  of  installation 
instructions in force.

-

Gledhill  or  its  representative  was  given  the 
opportunity  to  check  complaints  on  site 
immediately after any defect occurred.

-

Confirmation  exists  that  the  system  was 
commissioned  properly  and    that  the  system 
was  checked  and  maintenance  was  performed 
annually  by  a  specialised  company  licensed  for 
this purpose.

(f) Components  of  our  products  other  than 
Storage Vessels and Integral Pipework.
We will either extend to the purchaser the same terms 
of  warranty  as  we  are  given  by  the  manufacturer  of 
the component or if the manufacturer does not give 
any warranty, replace free of charge any component 
which  becomes  defective  within  two  years  after  the 
date of the delivery by us and is returned to us at the 
purchaser’s expense but we shall not meet the cost of 
removal  or  shipping  or  return  of  the  component  or 
any  other  cost  charges  or  damages  incurred  by  the 
purchaser.
If the appliance manufactured by Gledhill incorporates 
a factory fitted scale inhibitor then during the period 

Содержание BMA 215 OV-SOL

Страница 1: ... BMA 245 OV SOL BMA 265 OV SOL BMA 285 OV SOL All models comply with the water heater manufacturers specification for integrated thermal stores An open vented central heating and mains pressure hot water supply appliance with a thermal store designed specifically for use with solar energy ISSUE 5 06 08 ...

Страница 2: ...s can be achieved via a Competent Person Self Certification Scheme as an option to notifying the Local Authority directly Similar arrangements will follow for Scotland and will apply in Northern Ireland from 1st January 06 CORGI operates a Self Certification Scheme for gas heating appliances These arrangements represent a change from the situation whereby compliance with theBuildingRegulationswasa...

Страница 3: ...s OV SOL model is only suitable for use with an open vented central heating system An SP model is available for sealed central heating systems The BoilerMate A Class OV SOL is not covered by section G3 of the current Building Regulations and has no special requirements with regard to Building Control The information in this manual is provided to assist generally in the selection of equipment The r...

Страница 4: ...oilerMate A Class OV SOL appliance generally follows the principles of the standard BoilerMate A Class OV appliance but is fitted with a separate set of coils to allow it to maximisetheavailableamountofheatavailable from the solar panels controls This is then used to supplement both the heating and hot water systems Because this product does not require a safety discharge from a temperature and pr...

Страница 5: ...ctors The built in controller also incorporates the facility to operate the heating pump for a few seconds every few days when the heating is not being used to reduce the likelihood of the pumps sticking as well as providing a boiler pump overrun facility Any automatic boiler designed to operate on an 82 C flow and a 71 C return up to a maximum of 35kW can be linked to any suitable model of Boiler...

Страница 6: ...from collector 30 Solar circulating pump modulating 31 Flow and temperature sensor SR 32 Expansion vessel connection solar circuit 33 Temperature sensor SZ 34 Temperature Sensor SC is supplied complete with 2 5 metres of 2 x 0 75mm2 high temperature silicon cable 35 Safety open vent 36 Cold feed expansion 37 Thermal store drain 38 Solar coil drain 39 100mm high installation base Optional Equipment...

Страница 7: ...low in line with the pipe sizing calculations 2 The flow rates are based on a 35 C temperature rise and assume normal pressure and adequate flow to the appliance The actual flow rate from the appliance is automatically regulated to a maximum of 28 litres min 3 Unit is supplied on a 100mm high installation base 4 The domestic hot water outlet temperature is automatically regulated to approximately ...

Страница 8: ...485 710 785 The above dimensions do not include the 100mm high installation base Minimum Cupboard Dimensions Model Height D Width E Depth F BMA 215 OV SOL 2080 660 630 BMA 225 OV SOL 2080 660 630 BMA 235 OV SOL 2025 660 630 BMA 245 OV SOL 2025 710 700 BMA 265 OV SOL 2025 740 725 BMA 285 OV SOL 1935 810 795 The above dimensions include the 100mm high installation base In the case of the 215 225 mod...

Страница 9: ...s to connect to the appliance from any direction It is easier if all pipes protrude vertically in the cut out area shown Compression or push fit connections can be used All pipe positions are approximate and subject to a tolerance of 20mm in any direction A 15mm cold water supply and a 22mm warning overflow pipe will also be required for the separate feed and expansion tank Note All dimensions are...

Страница 10: ...uns to connect to the appliance from any direction It is easier if all pipes protrude vertically in the cut out area shown Compression or push fit connections can be used All pipe positions are approximate and subject to a tolerance of 20mm in any direction A 15mm cold water supply and a 22mm warning overflow pipe will also be required for the separate feed and expansion tank Note All dimensions w...

Страница 11: ...from channel 1 of the clock Store Shows if there is a demand for the store to be heated by a boiler primary circuit Boiler Shows if the boiler is on P CH Shows if the demand is present for central heating from channel 2 of the clock Rstat Shows if there is a demand from the room thermostat CHpump Shows if the central heating pump is on SolH Shows if there is a demand for heat from the solar circui...

Страница 12: ...ich the thermal store is satisfied when being supplied with heat from the boiler is 77 C i e the off control set point of sensor S6 The solar system will start from a minimum 10 C differential between the temperature in the store SZ and the temperature at the solar panel collector SC i e the solar circulating pump only runs if the temperature as SC is at least 10 C above the temperature at SZ The ...

Страница 13: ...pe code set on the controller The two must APPLIANCE CONTROL BOARD A C B Fuse T3 15L 250V 2 DIGIT ACB BOARD DISPLAY FLOW CHART Press S2 Press S2 Press S2 Press S2 Press S2 S2 S1 Press S1 Press S1 Press S1 Press S1 Appliance type Press S1 Press S1 Press S1 Press S1 Appliance type Press S1 Press S1 Press S1 Press S1 Fault code indicator block outs Press S1 Press S1 Press S1 Press S1 Fault code indic...

Страница 14: ...f the selected appliance code does not match with the ID resistor fitted to the appliance then an error 33 will be displayed A table showing this and other common fault codes is shown below Fault Codes Fault code locations are numbered C0 CF andc0 cF CO cO locations hold the latest fault recorded A code of FF indicates that the fault location is empty If a sensor is faulty instead of a temperature...

Страница 15: ...should be made to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce the rate of accumulation of lime scale To comply with this requirement the hardness of the mains water should be checked by the installer and if necessary the optional factory fitted in line scale inhibitor should be specified atthetimeoforderforhardnesslevelsbetween 200 and 300 ppm m...

Страница 16: ...ter systems by the manufacturer and is installed fully in accordance with their recommendations It is also essential that if an alternative pipework material system is chosen the manufacturer confirms that the design criteria of the new system is at least equivalent to the use of BS EN Standard copper pipework and fittings or the pipework sizes are increased accordingly Taps Shower Fittings Aerate...

Страница 17: ...e must not exceed 0 6 bar The F E cisterns must be installed at the same level and a typical arrangement is shown above If installed in a roofspace suitable insulation will need to be provided to the cisterns any pipework to protect them from damage by frost IfanyradiatorsarelocatedabovetheleveloftheBoilerMateA ClassOVSOLthesystem should be designed so that gravity circulation does not occur when ...

Страница 18: ...onswithregardtopipeworksystemsinthismanualaregenerally based on the use of BS EN Standard copper pipework and fittings However we are happy that plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic heating systems by the manufacturer and is installed fully in accordance with their recommendations We always recommend the ...

Страница 19: ...and must also be at least 250mm above the highest point of the system The height of the bottom of the F E cistern from the base of the store should be no greater than 6m A gravity check valve should be fitted in the boiler return pipework to prevent gravity circulationbetweentheBoilerMateA Classand the boiler during dormant periods ConnectionofBathroomRadiator Towel Rail for Summer use IfseparateS...

Страница 20: ...r a high level termination from walls or on roofs is not normally considered acceptable because of the possible harm to people below A suitable solar expansion vessel will also be requiredanda15mmconnectionwithpressure gauge is provided on the top of the appliance The vessel shall be sized and the initial filling pressure established in accordance with an approved method such as set out in Appendi...

Страница 21: ...lifting and fitting the solar panels collectors on the roof To prevent overheating in the summer and discharge from the pressure relief valve we suggest a saving of 50 of the energy required for the domestic hot water should be used as the target when calculating the number area of solar panels collectors required In addition to this we believe that a further 10 15 saving willbeachievedbecausetheB...

Страница 22: ... two smaller appliances it may be possible to fit these at high level in the cupboardhousingtheBoilerMateA ClassOVSOL However itisnormalforthesetobe fitted elsewhere in the property such as the roofspace The 2 cisterns must be fitted at thesamelevelandabovetheapplianceinaccordancewiththedetailsshowninFigure 1 10 The location will need to provide a suitable route from the appliance for the cold fee...

Страница 23: ...intopositionin the cupboard on top of the base and the front panelremovedbyunscrewingthe2screwsand liftingthedoorupandout readyforconnection ofthepipeworkandelectricalsupplies Thefeed andexpansioncisternsupportshallbeinstalled ensuring that the base is fully supported the working head of the appliance is not exceeded and the recommended access is provided for maintenance see the Technical Data sec...

Страница 24: ...ry return connection to boiler 22mm compression 8 Heating return connection 22mm copper tube 9 Solar coil drain connection Rc 1 2 10 Primary flow connection from boiler 22mm copper tube 11 Thermal store drain connection Rc 1 2 12 Domestic mains cold water connection 22mm compression 13 Domestic hot water connection 22mm compression All factory made joints should be checked after installation in ca...

Страница 25: ...e roof space then this and the pipework will need to be adequately insulated to protect against frost damage Combined feed and open vent pipe arrangements must not be used No valves should be fitted in the safety open vent which must be a minimum of 22mm copper pipe or equivalent The overflow warning pipe shall have a continuous fall be fitted to discharge clear of the building and be sited so tha...

Страница 26: ...ply 230VAC 50Hz 32Amps 6 0 10 0mm Twin Earth Cable PVC 10 0mm is only required when there is a high ambiant temperature and or long cable run CH1 HOT WATER CH2 CH TWO CHANNEL DIGITAL CLOCK 1 2 3 4 5 L 3 1 2 4 ISSUE No 4 APPROVED DATE MARCH 2008 DO NOT SCALE FROM THIS DRAWING COPYRIGHT OF THIS DRAWING IS RESERVED IT IS NOT TO BE REPRODUCED COPIED OR DISCLOSED TO A THIRD PARTY EITHER WHOLLY OR IN PA...

Страница 27: ...estic Hot Water OUT Bottom store sensor 1K5 Resistor ID_Resistor White Middle store sensor S1 S2 SENSOR LEGEND Sc Sz Solar Collector sensor 20K Dedicated Solar Zone 20K Br Br O O Br Wh S5 S6 Br Wh Bl Br Br Bl Sr S 7 Solar Return Temp 147DI Solar Flow Rate 147DI F G Y Or Wh BL J34 J5 J30 J31 J9 1 Solar Collector Sensor fitted in the panel sensor pocket provided by manufacturer Minimum pocket size 8...

Страница 28: ...d hot surfaces The supply to the BoilerMate A Class OV SOL must be protected by a type B MCB to BS EN 60898 of at least 32 amps rating Two installer supplied cables are required to connect the external room thermostat and boiler These cables must each be 4 core and at least 1mm2 or above in size For maintenance purposes it is essential that a 3 pole isolator is positioned within 2 metres of the re...

Страница 29: ...r means that frost protection is required for the boiler circuit then a frost thermostat and pipe mounted thermostat should be fitted in the normal way and wired back to the special terminal SL F provided in the appliance as shown below Br Br Blk Br Blk PIPE THERMOSTAT 4 Core 4 Core ROOM THERMOSTAT FROST THERMOSTAT Temperature setting range 3 to 20 C Set to 5 C 1 1 3 3 1 2 C 2 2 Bl Bl BoilerMate A...

Страница 30: ...ARNING LABEL ANDTHEN COMMISSION THE SWITCH FACILITY Roomthermostat SL L E N Factory fitted 2 channel digital clock prewired Typical external wiring of a BoilerMate A Class OV SOL L SL_B E N E L_P N_P Boiler Wiring Terminals e g Gledhill HEBoiler Double pole Isolator Within 2 meters of appliance Permanent mains supply 230V 50Hz rated at 6 500W And fused at 32A 6 0mm Feed Cable 2 MCB 2 MCB 1 MCB 3 1...

Страница 31: ... set as normal to control the hot water but channel 2 must be set to continuous operation mode Manual Isolating Valves Connection to BoilerMate OV SOL heating return pipe Connection to BoilerMate OV SOL heating flow pipe Connection to BoilerMate OV SOL elec terminals Zone 1 Programmable room thermostat Zone 2 Programmable room thermostat Zone 1 Flow Zone 2 Flow Zone 1 Return Zone 2 Return TYPICAL ...

Страница 32: ...lumes Inmostcasesthequantitiesshownoppositewill be adequate for a typical installation Primary Water System Treatment When determining the quantity of inhibitor required be sure to allow for the increased volume of water in the primary circuit due to the thermal store see the Technical data section for volumes Inmostcasesthequantitiesshownoppositewill be suitable for a typical installation Failure...

Страница 33: ...ges 13 14 of these instructions Either can be used The demands are shown on display 2 left hand and the resultant actions on display 1 right hand A diagram and table showing the function of each LED is shown opposite Set the BoilerMate A Class OV SOL power switch to on the dot in the right hand corner of display 2 will flash Set the hot water channel 1 on the digital clock on the front of the appl...

Страница 34: ...ormal temperature before balancing the system in the usual way to achieve a temperature drop of about 10 C Set channel 2 of the digital clock and room thermostat as per manufacturer s instructions supplied and ensure that the digital clock instructions along with the user instructions for the appliance are left with the user Commissioning the Domestic Hot Water System When the store is fully up to...

Страница 35: ...filling pump and pressure the system to 4 bar WATCHING THE LEVEL OF FLUID IN YOUR BOTTLE and adding more antifreeze solution if required When a pressure of 4 bar is achieved close the filling point on the fill and flush valve at the SAME time switch off the power at the RCD safety device Now leave the system under this pressure for at least 30 minutes Check the system for leaks including the roof ...

Страница 36: ... clearance above the F E cistern to service the ballvalve meet the Water Regulation Requirements 5 DO ensure that any range rated boilers are set at the highest output and the boiler thermostat is set to maximum for all boilers 6 DOensurethatthebottomoftheF Ecisternisatleast250mmabovethehighest point on the radiator circuit or the highest point of the system 7 DO check that the bottom of the F E c...

Страница 37: ...ice or through any of the larger plumbers merchants specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 01253 474401 However all components are readily accessible and can be changed quickly and easily by the installer using common plumbing practice Note The PHE circulating pump is a Grundfos UPR 4 wire type and any replacement must be the same model...

Страница 38: ... XG083 215 225 12 F E cistern ball valve Vemco FT206 All 13 1 x 6 kW switch immersion heater Wardtec XB468 All 14 Bottom store sensor Tasseron GT198 All 15 Middle store sensor Tasseron GT198 All 16 Top OHT store sensor Tasseron GT199 All 17 Main PCB controller Argus Vision XB442 All 18 Front panel digital display membrane R H Technical XB473 All 19 Front panel display wiring harness R H Technical ...

Страница 39: ...Page 39 SERVICING SHORT PARTS LIST 1 2 3 4 28 5 6 14 15 7 9 8 10 11 12 13 17 18 19 24 23 22 20 25 27 29 34 35 33 32 31 30 36 16 21 26 ...

Страница 40: ... that the store is charging to at least 77 C Check that the hot water plate heat exchanger pump stops and starts when the hot water tap is opened and closed Check that the space heating and hot water load is not greater than the boiler output and that the BoilerMate A Class OV SOL model is suitable for the type of dwelling If all the above checks are satisfactory then it is possible that the perfo...

Страница 41: ...ood House 40 New Road Stourbridge West Midlands DY8 1PA Telephone 01384 442611 Fax 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps ...

Страница 42: ...otal 10 15 APPENDIX APPENDIX B Two sets of manifolds are available as an optional extra Each set comprises a separate hot and cold water manifold Both are provided with a 22mm inlet connection located centrally All outlet connections are 15mm compression The centre to centre dimension of each branch is 55mm 595mm 2 No 6mm fixing holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm ...

Страница 43: ...the sink should be branched off the cold water main prior to the treatment device instead of the cold water manifold Anyotherisolating controlvalvesandbackflow protection devices should be provided as necessary to comply with the Water Regulations An optional location where cupboard space is tight Table 1 Maximum equivalent pipe length in 15mm copper Inlet pressure bar Maximum equivalent length of...

Страница 44: ...Page 44 APPENDIX APPENDIX C ...

Страница 45: ...the product Each appliance is supplied with a pallet which has been attached to the unit via the packaging The pallet will also allow for one or two persons to get a good hold e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of ...

Страница 46: ...in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge during the first year after delivery by us ii thereafter at a charge of one tenth of the then current list price and any copper price supplement and delivery charge during the second year after del...

Страница 47: ...ject to of any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph 2 above i the Purchaser shall hold the goods in a fiduciary capacity for us and shall store ...

Страница 48: ...Thecodeofpracticefortheinstallation commissioning servicingofcentralheatingsystems ...

Отзывы: