Page 2
These instructions should be read in conjunction with the installation/
servicing instructions issued by the manufacturer of the heat source
being used.
Any installation must be in accordance with the relevant requirements
of the Gas Safety Regulations, Building Regulations, I.E.E. Wiring
Regulations and the Water Fitting Regulations (England and Wales)
or Water Byelaws (Scotland). It should be read in accordance with
the relevant recommendations of the following:
BS 6798; BS EN 12828, BS EN 12831, BS EN 14336; BS 5546;
BS 5440:1; BS 5440:2; CP 331:3
BS EN 806-1 to 5, BS EN 8558:2011: BS EN 1458-1:2011 and BS
7593:2006
It must be installed by a competent person as defined by the relevant
regulations. Manufacturers notes must NOT be taken as over-riding
statutory obligations.
This appliance is not intended for use by persons (including children)
with reduced physical, sensory or mental capabilities, or lack of
experience and knowledge unless they have been given supervision
or instruction concerning use of the appliance by a person responsible
for their safety. Children should be supervised at all times to ensure
they do not play with the appliance.
This information is provided to assist generally in the selection of
equipment.
Responsibility for selection and specification of our equipment must
however remain that of our customer and any experts or consultants
concerned with the installation(s).
PLEASE NOTE: THAT WE DO NOT THEREFORE ACCEPT ANY
RESPONSIBILITY FOR MATTERS OF DESIGN SELECTION OR
SPECIFICATION, FOR THE EFFECTIVENESS OF AN INSTALLATION
OR SYSTEM CONTAINING ONE OF OUR PRODUCTS UNLESS
SPECIFICALLY REQUESTED TO DO SO IN WRITING.
All goods are sold subject to our Conditions of Sale which are set
out at the rear of this specification. In the interest of continuously
improving the Stainless Lite range, Gledhill Building Products
Limited reserve the right to modify the product without notice, and
in these circumstances this booklet, which is accurate at the time of
printing, should be disregarded. An updated set of Instructions will
be produced and supplied with new appliances and will be made
available for other appliances on request.
Stainless Lite Buffer Store is produced under an iso 9001:2008 quality
management system approved by bsi.
ISSUE 7: JANUARY 2014
Section Page
DESIGN
Description
3
Technical
Data
4
INSTALLATION
Installation
8
Commissioning
10
APPENDIX
Appendix
A
11
Appendix
B
12
Notes
13
Benchmark
Checklist
16
Benchmark Service Record
17
Terms & Conditions
18
Benchmark places responsibilities on both manufacturers and installers.
The purpose is to ensure that customers are provided with the correct
equipment for their needs, that it is installed, commissioned and serviced
in accordance with the manufacturers instructions by competent
persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate
compliance with Building Regulations and should be provided to the
customer for future reference.
Installers are required to carry out installation, commissioning and
servicing work in accordance with the Benchmark Code of Practice
which is available from the Heating and Hot Water Industry Council who
manage and promote the Scheme. Visit www.centralheating.co.uk for
more information.
For further information on the HWA Charter Membership, please refer to
the HWA website hotwater.org.uk.
Содержание 120IND
Страница 11: ...Page 11 APPENDIX APPENDIX A ...
Страница 13: ...Page 13 NOTES ...
Страница 14: ...Page 14 NOTES ...
Страница 15: ...Page 15 NOTES ...