Glasdon Single Orbis Sign Kit Скачать руководство пользователя страница 4

4.

NEW SIGN KIT INSTALLATION

IMPORTANT NOTE:

 PLEASE ENSURE THAT ALL RELEVANT PERSONNEL READ THE POINTS LISTED WITHIN THIS LEAFLET AND 

THAT A COPY IS GIVEN TO STAFF INVOLVED WITH THE INSTALLATION AND MAINTENANCE OF THIS PRODUCT.

SAFETY NOTE:

 PLEASE REFER TO ‘THE MANUAL HANDLING OPERATIONS REGULATIONS 1992’ DURING HANDLING.

5.

Insert the M8 Hex Bolts through the Orbis fixing 

holes.

Should you require any further assistance please contact us on

tel: 01253 600410, fax: 01253 792558 or email: [email protected]

 

.

Issue 3 - 06 Nov 2017 - Stock No. C000/0499 - DWG No. 07B324-111

AND ORBIS SIGN KIT ARE TRADEMARKS OR REGISTERED TRADEMARKS OF GLASDON GROUP OR 
ITS SUBSIDIARIES IN THE U.K. AND OTHER COUNTRIES

A planned maintenance schedule or regular inspection is 

recommended, replacing components as necessary.
Replacement components are available direct from GLASDON.
GLASDON cannot be held responsible for claims arising from incorrect 

installation, unauthorised modifications or misuse of the product.

© Copyright JULY 2017

Glasdon UK Ltd reserve the right to alter specifications without prior notice.

Secure in position with M8 Washers and Nuts 
using 13mm Spanners.

10.

9.

Locate second Orbis onto the exposed fixing 

bolts, which will hold all the units together.

6.

Align the 2 Point Bracket with the fixing holes 

on the Orbis Post.

7.

Then align the Sign Carrier fixing holes with 

the 2 Point Bracket and the Orbis Post.

8.

Locate Orbis with fixing bolts in to the 2 Point 

Bracket, Orbis Post and Sign Carrier.

Отзывы: