8
Installation (continued)
A
J
K
I
1
2
3
B
F
K
A
Flushing and checking for leaks
1
Operation
IMPORTANT:
After installation is complete, remove
the aerator to the flush the water lines. Do not lose the
gasket in the aerator.
9
Attaching the quick connecting
hose
□
Remove the cap from the quick connect hose.
□
Attach the quick connecting hose (I)
connections to the hot faucet handle (A)
connection, faucet body (J) connection, and
cold faucet handle (K) connection. Push until
the connections snap together.
□
Pull down moderately to ensure the connection
has been made.
10
Connecting the supply lines
□
Use 1/2 in. I.P.S. faucet connections (1), or
a 3/8 in. O.D. ball-nose riser (2) with supply
line coupling nuts (3) (not included).
□
Use two wrenches to tighten the
connections. Do not over tighten or torque
the copper supply line.
□
Ensuring the handles are in the off position,
turn on the water supply and check for
leaks. If you discover any leaks, check your
connections to ensure they are installed
properly.
□
Use a coin to remove the aerator (F) from the
faucet (A). Turn on the hot and cold handles to
allow the water to run for at least one minute.
This flushes away any debris that could cause
damage to internal parts.
□
Turn off the water and reinstall the aerator and
housing (if applicable).