
Parallel operation:
When connecting batteries in parallel please follow the follow diagram as below.
This diagram can also be found in the installation manual on the Segen portal.
Please note
: It is important that the DIP switches are set as indicated.
The DIP switches on all batteries should be 0101.
Failure to set the DIP switches will result in a failure of communication.
The parallel communication cables and busbar links are included with each battery.
Switching the system on and settings:
Now that all your connections are correct, we will have to switch the batteries on and
program the inverter.
Please follow the following steps:
1.
Switch on all the batteries in the bank with the main power switch.
2.
Now the SOC lights on the batteries will turn on. Please wait for the outer ring of the SOC
light to stop flashing every 3 seconds. Once the batteries have stopped flashing
constantly, the outer light will now flash every 10-15 seconds.
This means the battery is now on.
Содержание G2500-24
Страница 1: ...Giter Kodak OG Guide ...