![Gis LPM Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/gis/lpm/lpm_translation-of-the-original-instruction-manual_2229328005.webp)
Swiss Lifting Solutions
5
Where equipment is permanently installed in locations where events take place, electric chain hoists according to BGV C1/GUV-V C1 should be
provided, on account of the mode of operation and the anticipated risks.
Excessive inching operations, ground mooring and driving against the limit stops should be avoided. The manufacturer accepts no responsibility
for damage to equipment and third parties ensuing from such action.
1 Description
The LPM series comprises the following models: D8, D8 Plus.
1.2 General description
When the equipment is commissioned, and periodically thereafter, the functionality of both brakes must be examined. The periodic examination
should be carried out by competent personnel annually and by an expert every four years.
The verifiability of the individual brakes is to be provided by a control engineer. A sample control scheme for a D8 Plus electric chain hoist can
be obtained from GIS.
2 Start-up
2.1 Transport and assembling
Check the identification plate as to whether the electric chain hoist corresponds to the type ordered (D8 / D8 Plus).
The electric chain hoist must display the following markings:
Electric chain hoist D8 .............. : Triangle
Electric chain hoist D8 Plus ...... : Square
2.2 Connecting
2.2.1 Electrical connection
The appropriate electrical diagram can be found in the cover of the electric chain hoist. In the case of the D8 Plus electric chain hoists, once the
device is in position the power must be disconnected using a lockable switch.
The principles according to BGG 912/GUV-G 912 are to be applied. A test log is to be created, consisting of the installation documentation from
the manufacturer and the test records. Plans and descriptions for electrical installation are specific projects complemented by the appropriate
control engineer.
3 Care and maintenance
3.3 Ordering spare parts
The appropriate assembly diagram is considered to be a supplement to the parts catalogue.
Содержание LPM
Страница 2: ......
Страница 10: ...10 Swiss Lifting Solutions 5 5 Notes ...