Gilson HM-382 Скачать руководство пользователя страница 3

3

the test is started, the switch setting is ignored until the 

stop switch is pressed or a limit switch is tripped.

Limit Switches

 – These switches are located on the 

platform behind the water chamber. 
Adjustment of the limit switches is made by loosening 

the Phillips-head screws and moving the limit switch 

assembly in the direction desired. The home position 

has been set so that the load crossarm is in the middle 

of the shear rings. 

Note: The limit of travel of the drive shaft is dependent 

on the limit switch settings. Do not operate the drive 

motor with the water chamber disconnected because 

this will make the limit switches inoperable.

Stop Switch

 – Push button to stop the 

 

motor.

Direction Switch

 – Momentary (spring loaded) switch. 

After setting the desired shear rate, moving the switch 

in the desired direction will initiate movement. This 

switch will then become inactive until the stop button is 

pressed, or a limit switch is activated. The left position 

will move the water chamber to the left. It will continue 

until the water chamber activates the limit switch. At 

this time, the limit indicator light will be lit. The right 

switch position will move the shear box to the right until 

the home limit switch is made. See above note…

Residual Counter

 – Two-digit thumbwheel is used for 

setting the number of residual shear passes required.  

One shear pass will allow the shear box to travel from 

the home position to the limit switch setting.  Two pass-

es will travel from the home position out to the limit 

switch and then return to the home position.  Each 

pass completed will register on the digital readout to 

the right of the thumbwheels.  Choose between 0-99 

passes.

Home & Limit Indicators

 – Used to indicate the limit 

of travel of the shear box.

Fuse

 – 4 amp SLO BLO fuse located in the cabinet 

rear.

 

OPERATING INSTRUCTIONS

Read all operating instructions before performing a test 

and refer to ASTM D3080 or AASHTO T 236 for com-

plete test procedures and calculations.

Set Up

1.  Place the shear box into the water chamber and se-

cure the load cell shaft to the top of the shear box.

2.  Tighten the two shear ring clamping knobs located 

on the left side of the water chamber.

3.  Install the counterbalance, Model 2000-75, if nec-

essary. 

4.  Tare the load cell by pressing the “Tare” button on 

the digital readout.  

5.  Adjust the top cross arm and dial gauge so there is 

1/8in gap between the cross arm and loading ball. 

Align the cross arm pin so it is above the loading 

ball.  Make sure the cross arm is level.

6.  Adjust the LVDT by raising or lowering the indicator 

rod and holder so the tip of the LVDT is resting on 

the cross arm pin.   

Consolidation

1.  Select a seating load with the load setting calibration 

chart.  Set the HIGH LOAD or LOW LOAD knob to 

LOW  and the Load Valve to “LOAD.” 

2.  Adjust the Fairchild Pressure Regulator to the de-

sired seating load per the load setting calibration 

chart, this value is displayed on the digital readout 

box, channel 4.  

3.   Turn the “LOAD” knob to “OFF” and adjust the Pres-

sure Regulator to the desired normal load based 

on the load calibration chart.  If reading from the 

“LOW” calibration chart keep the knob on the LOW 

LOAD position.  If reading from the “HIGH” calibra-

tion chart, turn the knob to “HIGH LOAD”

4.   Tare the LVDT on channel 3 before beginning con-

solidation.

5.   Turn the Load Valve to “LOAD” to begin consolida-

tion.  

6.   Load and swell readings will be displayed on chan-

nels 3 and 4 of the readout box and transferred to 

an  Excel  file  or  the  Direct  Shear  Data Acquisition 

Software on the users connected computer.  

Direct Shear

1.  After consolidation phase is complete, add a small 

seating shear load by adjusting the two knurled nuts 

on the load cell support.

2.  Tare the shear load cell which is displayed on chan-

nel 1 of the digital readout box.

3.  Remove the two holding screws on the shear box 

to separate the top and bottom sections.  Adjust the 

four adjusting screws on the shear box to set the 

gap between the top and bottom of the shear box.  

One full turn of these adjusting screws will give a 

0.031in (0.78mm) gap.  

Отзывы: