 6'-0" 

 1'-0" 

 4'-0" 

DETAIL B

Slope footing for 

Tab

DIRECTION

NET 

proper drainage

Packed Gravel
or Concrete Pad

 4

1
2 "

Concrete must be allowed to fully cure before continuing

Read all of the instructions before beginning. Make sure you have 
all parts and tools you will need. Consult local codes and guidelines. 
Local conditions may require a different procedure, the following 
instructions should be considered recommended minimums. 

CAUTION

 - contact your local utility companies to locate burried 

electrical, gas, and water lines 

before

 digging holes for footings. 

Also check for overhead utilities.

1.

Locate and dig footings for each upright. Pole location is shown 

on page 1. Poles are permanently set in concrete. Confirm all 
locations before setting. Pour a flat, 12" deep concrete pad in the 
bottom of the formwork and let it set hard.

Center the pole on concrete pad. Use 2x4s or scaffolding to secure 
the pole in a level and plumb position. Brace in both directions. 

Pour concrete around the outside of the pole to the top of the hole 
being careful not to move the pole. Protect the pole from damage 
during pouring. 

The footer size is to be determined by the architect/engineer and is 
based on local codes and soil conditions. The footer must also be 
designed and built to withstand a minimum of 1,300 lbf of shear and 
a moment of 12,300 lb-ft (@ 90 MPH wind).

IMPORTANT!!!

-

Poles must be set so the bottom tab is 

facing in towards the net. Bottom tab should be set 4-1/2" 
above the ground. See DETAIL A and B

INST330175

www.gillathletics.com

Page 2 of 8

800-637-3090

12/12/2017

All rights reserved.

BASEBALL/SOFTBALL BATTING TUNNELS

Copyright

H

2016 by Gill Athletics.

ASSEMBLY INSTRUCTIONS

DETAIL A

Содержание 330155

Страница 1: ...ght 2016 by Gill Athletics ASSEMBLY INSTRUCTIONS 2 0 2 0 15 0 83 0 15 0 16 0 4 0 No 330355 No 330275 POLE LAYOUT SOFTBALL 55 x 14 Nets BASEBALL 75 x 14 Nets SINGLE NET DOUBLE NET TRIPLE NET No 330155...

Страница 2: ...g Pour a flat 12 deep concrete pad in the bottom of the formwork and let it set hard Center the pole on concrete pad Use 2x4s or scaffolding to secure the pole in a level and plumb position Brace in b...

Страница 3: ...and footers have cured main tension cables can be installed as shown below Enough cable one continuous piece will be provided to complete entire setup Measure out all cable before making cuts One side...

Страница 4: ...8 2020 www gillathletics com All rights reserved Copyright 2016 by Gill Athletics ASSEMBLY INSTRUCTIONS PULY00101 ROPE00119 ROPE00120 ROPE00120 DETAIL E HDWE57041 ROPE00119 ROPE00120 Cross Cable NOTE...

Страница 5: ...letics ASSEMBLY INSTRUCTIONS After both cross cables are in place center cable can be strung from side to side as shown in DETAIL G Center the cable on the cage Check and tighten all cables at this ti...

Страница 6: ...ch end of the batting tunnel you would like the door to be placed and orient the net accordingly Install snap hooks every 3 4 along the perimeter edging material Lastly attach snap hooks along the cen...

Страница 7: ...etics com Page 7 of 8 12 12 2017 800 637 3090 All rights reserved BASEBALL SOFTBALL BATTING TUNNELS Copyright H2016 by Gill Athletics ASSEMBLY INSTRUCTIONS THIMBLE ROPE00119 ROPE CLIP ROPE00120 TURNBU...

Страница 8: ...ROTECTION FOR SPECTATORS HOWEVER STRICT SAFETY PRECAUTIONS AND ADULT SUPERVISION MUST BE OBSERVED AT ALL TIMES TO MINIMIZE THE POSSIBILITY OF ACCIDENTAL INJURIES SPECTATORS MUST BE INSTRUCTED TO STAND...

Отзывы: