PA0338X00X D-Box Installation
Preparing for Installation
Page 24
MDE-4318D Competitive Pump and CRIND (CPC) Hardware/Software Start-up and Service Manual · May 2010
4
Disconnect J5 on the Power Supply Board and connect it to J8 on the motherboard, if
applicable (
).
Figure 2-7: Connecting the J6 and J8 Connectors
Move Cable from
J4 to J6. Move
Cable from J5 to
J8, if available.
Note: The two cables connected to J6 and J8 must not be connected anywhere. Stuff the
cables down into the box and ensure that the contacts do not touch the chassis.
5
Turn on power to the 67B Box, using the switch on the top.
Preparing for Installation
Unpacking Equipment
When the equipment arrives at the installation site, each unit must be unpacked and inspected
for possible shipping damage. Report any damage to the carrier. Shipping damage is not
covered under Gilbarco’s warranty policy. After visual inspection, place the unit back in the
shipping carton and store it indoors until it is ready for installation.
Returning Components
Components returned to Gilbarco under warranty or for repairs are subject to severe shipping
damage, if not packaged properly. If the original packing materials are unavailable, use a
durable reinforced corrugated box and obtain suitable packing material such as “Pakon”
polyfoam chips, polyurethane foam chips, or polystyrene foam chips.