background image

 

Capricorn 4-Port Outdoor CPE Installation Guide 

 

 

 

Proprietary to Gilat Satellites Networks Ltd. 

 

 

DCP0000169(D) 

Preparing for Installation 

 

 

C

AUTION

 

 

T

HE 

CPE

  MUST  BE  GROUNDED  PRIOR  TO  INSTALLATION  BY  ATTACHING  ONE  END  OF 

THE  GROUNDING  CABLE  TO  THE  GROUNDING  STUD  ON  THE  FRONT  OF  THE 

CPE,

  AND  THE 

OTHER END TO THE SITE MAIN GROUND CONNECTION

.

 

14AWG

 GROUNDING CABLE SHOULD 

BE USED

 

T

HE 

CPE

 MUST BE CONFIGURED PRIOR TO ATTACHING THE 

RF

 CABLES

 

T

HE POWER  CABLE  MUST  BE  DISCONNECTED  FROM THE 

CPE

 PRIOR TO  CONNECTING 

THE 

RF

 CABLES

.

 

 

 

 

 

C

AUTION

 

I

N ORDER TO PREVENT DAMAGE TO THE 

RF

 

C

ONNECTORS

,

 SECURE THE CABLES TO A 

PERMANENT

,

 STATIC OBJECT SUCH AS A TABLE OR PIPE

,

 AT A DISTANCE OF 

25-60

 CM 

(10-25

 IN

.)

 FROM THE 

CPE,

 PRIOR TO CONNECTION

.

 

 

Connecting RF Cable 

Connect the two RF cables, from the LNB and ODU, to the 

RF-IN

 and 

RF-OUT

 connectors 

respectively, using a recommended torque of 13 lbft/in (1.5 N/m). 
Use only the RF cables approved by Gilat. 
 

Connecting Grounding Cable 

Connect the grounding cable (GND) from the CPE to the approved site ground stud.  
 

Connecting LAN Cable 

Use only CAT-5 type cables to connect to the LAN port.  
Use only the LAN cable approved by Gilat. 
 

Connecting Power Cable 

Use only the Power cable approved by Gilat. 
 

 

 

Warning

 

P

OWER CABLE ASSEMBLY AND CONNECTION SHOULD BE PERFORMED ONLY BY A 

CERTIFIED ELECTRICIAN

 

Отзывы: