background image

Chapter 3 
Installation

   

Quick Installation Procedures:     

1.

 

Find a location close to the network devices and an 

electrical outlet. 

2.

 

Desktop Installation: Place switch on a smooth surface.     

3.

 

Rack Installation: Use the brackets and screws supplied 

in the rack mounting kit. Use a cross-head screwdriver 

to attach the brackets to the side of the switch. Position 

the switch in the rack by lining up holes in the brackets       

    with the appropriate holes on the rack, and then use the     

    supplied screws to mount the switch in the rack.         

4.

 

Plug the power cord or adapter into the power socket at 

the switch and the other end to the power outlet.   

Check if the Power LED on the front panel is on.       

5.

 

Connect workstations to switch using Category 3, 4 or       

5 UTP/STP cables for 10Mbps or Category 5 cables for 

100Mbps Fast Ethernet Connection. For convenience,   

we suggest you use Category 5 cables for all operation.   

 

 

 

6.

 

Verify network operation:   

    Verify that all attached devices have a valid connection.       

    The switch monitors the link status for each port.    If   

    any device is properly connected to the switch and   

    transmitting a link beat signal, the Link indicator will   

    light up for the corresponding port.    If the Link   

    indicator fails to light when you connect a device to the   

    switch, check the following items: 

a.

 

Be sure all network cables and connectors are 

properly attached to the connected device and the   

  switch.  

b.

 

Both sides of each connection must use the same 

  transmission mode.  The switch can use auto- 

  negotiation to set both speed and mode.  However,   

    full duplex can only be supported if the attached   

    device also uses auto negotiation. 

c.

 

See if your cable is functioning properly by using it   

    for another port and attached device that displays   

    valid indications when connected to the network.   

d. Be sure no twisted-pair cable exceeds 100meters.   

 

 

Содержание EE500-S

Страница 1: ...infinite amount of switches together and easily expand an existing network Indeed with its easy to use plug and play installation and outstanding performance at HUB price It also provides a detailed LED indicator display the Power Link Activity 100M and full duplex for monitoring your network simple and easy 1 About this Manual This manual briefly explains how to install and use this 5 8 16 Ports ...

Страница 2: ...ification FCC CE Mark Temperature 0 40 Humidity 5 90 3 Chapter 2 Hardware Description LED Panel Through the well organized LED indicators on the front panel you can easily monitor and diagnose the status and activity of each port while the hub is in operation LED function Color Description Power PWR Green Lit Power on Unlit Power off 100M Green Lit A valid 100Mbps connection Unlit A valid 10Mbps c...

Страница 3: ... Connection For convenience we suggest you use Category 5 cables for all operation 5 6 Verify network operation Verify that all attached devices have a valid connection The switch monitors the link status for each port If any device is properly connected to the switch and transmitting a link beat signal the Link indicator will light up for the corresponding port If the Link indicator fails to ligh...

Страница 4: ... 5 8 16 ports switch cannot be used Both of the two ports are not allowed to operate at same Time 7 FCC Warning This device has been tested and found to comply with Limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment ...

Страница 5: ...8 User s Manual High performance 5 8 16 Ports Fast Ethernet Switch ...

Отзывы: