3
unit assembly & set-up (cont.)
•
Slip one end of metal discharge hose (3:6)
onto barrel of discharge stack.
•
Secure hose in place with squeeze ring (3:7),
tightening all bolts securely enough to dimple
hose against barrel of stack and thereby
prevent slippage of hose on stack assembly.
INTAKE ASSEMBLY
•
Slip two hose clamps (2:9) onto one end of
intake hose (2:8), then slip end of hose onto
intake flange barrel (2:5), located in front of
impeller housing. Tighten clamps securely.
•
Slip Hose support band (2:10) about halfway
up the length of the hose, with eye clip
facing up.
•
Slip two hose clamps onto free end of intake
hose, followed by Intake Nozzle (2:11) with
handle pointed upwards and toward hose.
Tighten clamps securely.
HOSE SUPPORT BOOM ASSEMBLY
•
Attach yoke end of Threaded spring guide
(5:5) to second thru hole of horizontal boom
member (5:2) with one 1/2-13 x 3” hex bolt
(5:3), securing with 1/2-13 lock nut (5:4).
Do not over tighten lock nut. Note: Be sure
spring guide and chain eye at end of boom
are both toward bottom of boom member.
•
Attach horizontal boom member to vertical
boom member (5:1) with one 1/2-13 x 3”
hex bolt, securing with 1/2-13 lock nut. Do
not over tighten lock nut. Be sure spring
guide is toward base of vertical boom
member.
•
Remove 3/4” hex nut and flat washer (5:6-7)
from bottom of threaded spring guide. Slip
thread down through hole in base of vertical
boom member, securing with same hardware
as previously removed.
Manual No. 3100022
Not
for
Reproduction
Содержание 3800014
Страница 22: ...N o t f o r R e p r o d u c t i o n ...
Страница 23: ...N o t f o r R e p r o d u c t i o n ...