
3
unit assembly
HANDLE ASSEMBLY (cont.)
•
Slip bottom tubes of
Upper Handle (40)
into
top holes of support panel and into lower
handle tubes. Align holes in upper handle with
set of holes in lower handle assembly that
provides most comfortable height, insert one
5/16-18 x 1-3/4” hex bolt (42)
through each
side, then secure with 5/16-18 small serrated
flange nuts
(43).
•
Tighten all handle assembly hardware.
•
Secure
Throttle Control (44)
to left outer side
of upper handle with two
#10-24 x 1-1/4”
slotted head machine screws, lock washers
and
nuts (46-48)
. Tighten securely.
•
Secure throttle cable to upper handle with one
Throttle Cable Clip (49)
, positioning clip about
half-way up vertical tube of handle.
Assembly complete. Your unit is now ready to be started and checked for proper operation.
Some minor final adjustments may be required; see the Maintenance portion of this manual.