Powerturn
28
Installation
The drive is considered to have been installed properly when the screw tunnel (8) for the screw (7) is aligned.
X
Screw in the screw (7) (M6 × 40) (tightening
torque approx. 10 Nm).
X
Tighten the screws (6) at the lower clamping
claw (tightening torque approx. 10 Nm).
The drive is now fixed on the mounting plate.
6
7
6
8
7.6 Access to the 230 V connection with drive installed
X
Remove the cover (3), e-cover (2) and
the side panel (1).
X
Unplug the plug-in connectors from
the plugs (4) of the connector panel.
X
Pay attention to the crown gear while removing
the earthing screw.
X
Unscrew and keep the earthing screw (5).
X
Pull the flat ribbon cable (6) off the connec-
tor panel (7).
Содержание Powerturn
Страница 50: ...Powerturn 50 Powerturn installation check list...
Страница 51: ...Powerturn 51 Powerturn installation check list...
Страница 52: ...Powerturn 52 Powerturn installation check list...
Страница 53: ...Powerturn 53 Powerturn installation check list...
Страница 54: ...Powerturn 54 Powerturn installation check list...
Страница 55: ...Powerturn 55 Powerturn installation check list...