GEZE E 260 N2 Скачать руководство пользователя страница 11

 

10 

 

 

6 Connection of timer 
6.1 Timer per ventilator group 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 
6.2. Several ventilator groups with 1 timer 

 

1 switch contact is required for each direction of each ventilator group (OPEN/CLOSED)

The timer settings must be 
programmed as pulse signals. 
The ventilator switch will not 
function properly with sustained 
signal. 

e.g. 
timer 
2 channel 
(Müller SC28.21) 

Timer and ventilator switch have mutual priority switching 

Terminal block E260N 

STO

P

GND 

OPEN

CLOSE

Ventil. switch  

2  3  4  5  6  7 

LTA-230 

1 2 3

5 6 7

N L1

4 8

Mains 
230V AC

Channel A

Channel B

1  3  4  4  2 


T
O




Ventil. switch  

2 3 4 5 6 7

1

Terminal block E260N 

Ventil. switch

2 3 4 5 6 7

1

Terminal block E260N 

Ventil, switch  

2 3 4 5 6 7

1

Group 4 

Group 4 

1 2 3

5 6 7

N L

4 8

Channel

Channel 

e.g. 
time 
2 channel 

 

 

OP

CL

L1

N
PE

230V AC

Terminal block E260N 

1  3  4  4  2 


T
O

C

L

O


O


E

1 3  4  4  2 


T
O

C

L

O


O


E

1 3 4 4 2


T
O

C

L

O

S
E

O

P
E
N

118533-4 Connection Schema Emergency Power Supply System E260 N2/1 to N12/2-24V DC

Содержание E 260 N2

Страница 1: ...l System E 260 N OK St rung Netzausfall OK Fault Power outage gr n gelb gelb blinkend green yellow yellow flashing Connection Schema RWA Emergency Power Supply System E260 N2 N4 N8 N12 118533 4 Connec...

Страница 2: ...Calculation of the cross sections for motor lines 7 4 2 2 Examples for max line lengths in m 7 5 1 Connection of ventilator switch 8 5 2 Connection of several ventilator switches per ventilator group...

Страница 3: ...LTA 230 Ventilator switch LTA 24 arbitrary 3 ea per group Rain wind control unit SHE drives 24V DC with total current E260N2 1 2A or 2 drives E205 206 E212 E260N4 1 N4 2 4A E260N8 1 N8 4 7 5A E260N12...

Страница 4: ...33k Resistor 15k 5 for N12 3K9 1 1st smoke detector Last smoke detector 9 9 8 7 6 5 YE YE GN RD 24V Malfunct Oper OK Win OPEN LED fire 4 3 2 1 Alarm switch CLOSE switch Resistors leave in the last swi...

Страница 5: ...e must be marked accordingly and must not be freely accessible Check button and motor connections prior to connecting power and battery supply Insert fuse F3 prior to commissioning Terminal block E260...

Страница 6: ...ors remove in all preceding switches 2 SHE switch OPEN GND 9 8 7 6 5 YE YE GN RD 24V 4 3 2 1 Alarm switch CLOSE switch Both resistors remove in all preceding switches 1 st SHE switch 3 4 1 SHE switch...

Страница 7: ...1 2 3 Motor 24V DC 2 nd motor 1 2 3 Motor 24V DC Last motor if OPEN Monitoring Insulate conduct 3 1 2 3 Motor 24V DC 1 st motor Insulate conduct 3 1 2 3 Motor 24V DC 2 nd motor Insulate conduct 3 1 2...

Страница 8: ...motor Motor 24V DC Last motor Motor 24V DC 1 st motor 2k2 Terminal block E260N 2 3 1 Motor group if OPEN Monitoring 2 3 1 Ventilat switch 4 5 6 7 GND OPEN CLOSE D STOP If a motor group is not used te...

Страница 9: ...O S E O P E N green red 2 diodes e g 1N4007 to be con by customer Terminal block E260N Ventil switch 2 3 4 5 6 7 1 Watchdog circuit in the case of ventilation Motors are running as long as the button...

Страница 10: ...ls 5 6 and 7 are always connected in parallel GND Terminal block E260N Ventilat switch 2 3 4 5 6 7 1 LTA 230 1 3 4 4 2 S T O P C L O S E O P E N 1 3 4 4 2 S T O P C L O S E O P E N 1 3 4 4 2 S T O P C...

Страница 11: ...ng Terminal block E260N STOP GND OPEN CLOSE Ventil switch 2 3 4 5 6 7 1 LTA 230 1 2 3 5 6 7 N L1 4 8 Mains 230V AC Channel A Channel B 1 3 4 4 2 S T O P C L O S E O P E N Ventil switch 2 3 4 5 6 7 1 T...

Страница 12: ...2 1 Rain wind N PE L1 Mains 2 1 Rain wind 1 Emergency pow control unit 2 Emergency pow control unit 3 Emergency pow control unit Wind Rain N PE L1 Mains W R LEDs 2 3 1 Weather station N PE L1 Mains 2...

Страница 13: ...alarm malfunction default setting Jumper position B Signaling contacts have the function of an opener i e the contact is broken in the case of pending messages 2 1 Relay Alarm 2 1 Relay Wind OPEN 2 1...

Страница 14: ...13 118533 4 Connection Schema Emergency Power Supply System E260 N2 1 to N12 2 24V DC...

Страница 15: ...14 118533 4 Connection Schema Emergency Power Supply System E260 N2 1 to N12 2 24V DC...

Страница 16: ...Branch Office Beijing E Mail chinasales geze com cn www geze com cn France GEZE France S A R L E Mail france fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze h...

Отзывы: