Safety instructions
E 212 R1 / E 212 R / E 212
GB 6
X
X
Before the system is approved for operation carry out and log an isolati-
on measurement of the supply network of the system.
X
X
Use only cables prescribed in the wiring diagram. Implement the cable
type, line length and cross-section in accordance with the technical
specifications.
X
X
Always use wire-end ferrules for wire cores.
X
X
Insulate the cores that are not used.
In the case of 24 V DC and a longer power supply cable, the cable must have
a sufficiently large cross-section in order to prevent a voltage drop. See cable
plan for RWA central control units for cross-section calculation.
2.5
Safety-conscious working and usage
X
X
Secure workplace against unauthorised entry.
X
X
Watch swivelling range of long system parts.
X
X
Before working on the electrical system interrupt the power supply and
verify the safe isolation from supply. When using an uninterrupted pow-
er supply (UPS), the system will still be under power even when discon-
nected from the mains.
X
X
During the set-up actuate the drives only in inching mode.
à
Risk of injury through moving parts when a drive is opened (drawing in
of hair, clothing, etc.)
à
Risk of injury by unsecured trapping, knocking, shearing and draw-in
points
à
Risk of injury due to glass breakage.
à
Touching the window unit can result in injuries during operation.
2.6
Inspection of installed system
à
The measures for security and prevention of crushing, impact, shearing
or drawing-in spots, in particular at points with a height of less than 2.5
m are to be considered and carried out.
One measure, for example, is the use of switch with OFF default setting
(e.g. GEZE vent switch LTA-LSA Mat. No. 118476). In the case of children
or persons with a limited ability to judge, a key-operated switch with
an OFF default setting must be used (e.g. GEZE Mat. No. 117996 for SCT,
090176 for cylinder). The switch has to be mounted so that the points of
danger can be seen.
X
X
After the installation has been completed, check that the system is set
correctly and is functioning correctly and safely.
X
X
Check all the functions by means of a trial run.
à
The end user has to be instructed in all the important operating and
handling steps after completion.
Содержание E 212
Страница 11: ...E 212 R1 E 212 R E 212 DE 11...
Страница 21: ...230 V AC LTA LSA ID 118476 3 x 1 5 mm2 A I 4 x 1 5 mm2 BK 230 V AC N BU N N BN 230 V AC PE GN YE PE PE E 212 R1...
Страница 23: ...A III 1 GND 24 V DC 3 2 24 V DC GND E 212 3 x 1 5 mm2 24 V DC...
Страница 24: ......
Страница 25: ......
Страница 26: ...E 212 R1 E 212 R E 212 Notizen Notes...
Страница 27: ...E 212 R1 E 212 R E 212 Notizen Notes...