Geyer Fill-Master 5000 Скачать руководство пользователя страница 2

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Packaging Enterprises Inc.

 

Filler Machine Division

 

12N. Penn Ave., Rockledge, PA 19046

 

Telephone (215) 379-1234: Fax (215) 379-1166

 

Web site: www.packagingenterprises.com

 

Parts Email: [email protected]

 

Machine Sales Email: [email protected] 

 

 

Содержание Fill-Master 5000

Страница 1: ......

Страница 2: ...iller Machine Division 12N Penn Ave Rockledge PA 19046 Telephone 215 379 1234 Fax 215 379 1166 Web site www packagingenterprises com Parts Email parts packagingenterprises com Machine Sales Email fill...

Страница 3: ...ltering the Machine Speed Page 4 Continuous Mode Page 5 Adjustment for Quantity of Fill Page 5 Startup Page 6 Some Important Notes Page 6 Safety Procedures Page 7 Machine Cleaning Maintenance Page 9 L...

Страница 4: ...chine is placed on a level surface D ASSEMBLING THE MACHINE Generally after the filler has been tested in our plant it is shipped to you set up ready to operate Remove all tape and other materials use...

Страница 5: ...der and one at the bottom of the hopper next to the fill cylinder to operate the valve mechanism These air cylinders have been supplied with two flow controls each one at ether end of the cylinder and...

Страница 6: ...the tubing in the other hand the tubing will be released see illustration below You are in the process of disconnecting the foot pedal from the machine On the second tube remove the tubing with the fi...

Страница 7: ...fill Once the proper piston stroke is found tighten the nut on the threaded rod to lock in the stroke and seal the air cylinder itself J STARTUP Once the air connection has been made and you have tri...

Страница 8: ...pallet is a mechanically operated cut off device and extreme caution should be exercised while the machine is in operation IV While cleaning the machine making adjustments or replacing parts please t...

Страница 9: ...ay 1 Next remove the hopper 2 Then remove the pin in the piston rod clevis connecting it to the pallet crank 3 Next remove the cylinder from the valve and it push back out of the way 4 Now you can rem...

Страница 10: ...llet and valve and then reassemble 12 Re attach the valve to the base and tighten the bolt all the way 13 Now re connect the cylinder to the cylinder port in the valve 14 Then insert the pin into the...

Страница 11: ...to apply some Sana Lube 2000 to the air cylinder rods periodically to help maintain a smooth operation Keep all threaded parts tightened Threaded parts may come loose during every day use Check them...

Страница 12: ...through a three way valve II The valve Rotor pallet shifts position and the piston moves the product from the cylinder to the filling nozzle and into the container III The valve Rotor pallet shifts t...

Страница 13: ...12...

Страница 14: ...13...

Страница 15: ...Stainless Steel 1 16 Main Air Cylinder 2 5 x 10 1 17 Pneumatic Sensor 3 8 NPT 2 18 Flow Control 3 8 NPT 2 19 Quantity Adjustment Rod Stainless Steel 1 20 Locking Nut and Sealing Washer 1 Set 21 Quant...

Страница 16: ...valve Air Supply Tube 3 8 42 Male Tube Fitting 3 8 Tube 3 43 Muffler Main Air Valve 2 44 Sensor Signal Tube 45 Male Tube fitting Sensor Line 4 46 Main Air Cylinder Tube 1 47 Tube Tee with Reducer 3 8...

Отзывы: