9. Maintenance
procedures
9.1. Unskilled
The
e-Brick
forms part of a UV drying system which requires preventative maintenance
operations in accordance with the schedule in section 10.
Maintenance of the
e-Brick
is limited to visual inspection of associated cabling for damage and
replacement of air filters.
9.1.1. Visual inspection
Examine all cables associated with the UV drying system and confirm that cables, conduit
and connectors are in good condition. Cables should be neatly routed and protected from
damage at all times.
Warning!
Damaged cables must be repaired or replaced at the earliest opportunity to
maintain system performance and safety
9.1.2. Intake filter change
Warning!
Isolate power before changing or checking filters.
No tools are required when changing the intake filter; the cover of the filter housing is simply
unclipped and the old filter medium removed and replaced. The procedure is illustrated in
Figure for a 9kW
e-Brick
; the same procedure applies to the filters for 12/22kW units.
Figure 10: Intake air filter change procedure
GEW UV
e-Brick
installation and operating manual
44 of 49