17
Example of Installation
NW
LW
NB
GESTRA
Steam
System
s
GESTRA
LRG
16-40
Fig. 7
Conductivity metering, direct installation of electrode via lateral flanged connection
Conductivity metering and continuous boiler blowdown, direct installation of electrode via
measuring pot and connection of continuous blowdown valve
Fig. 8
NW
LW
NB
A
GESTRA
Steam
System
s
GESTRA
LRG
16-40
LRG 16-40
4
A
4 5
6 8 A
~ 250
400
336
1" (ISO 228-1)
R*
~ 250
600
336
1" (ISO 228-1)
R*
197
DN
[mm]
A
[mm]
15
182
20
184
25
184
40
189
R*: LRG 16-40, LRG 17-40 R = 30 mm
LRG 16-41
R = 60 mm
LRG 16-40
R*: LRG 16-40, LRG 17-40 R = 30 mm
LRG 16-41
R = 60 mm
Содержание LRG 16-40
Страница 29: ...29 For your notes ...
Страница 30: ...30 For your notes ...
Страница 31: ...31 For your notes ...