background image

  

 

 GERUS 

 

Seite/ page 10 von/ of 12

 

 

2  Starting and shutdown 

2.1  Operation test of Gerutest 

1.  Attach nozzle test bed to base. 
2.  Sealing of hose. 
3.  Check the display unit 

for damage and position 0 indicator. 

4.  Check oil and oil level gauge 

B.

 

5.  At low oil level fill the device with oil as follows: 
   5.1.   Choose the oil quality by allowance of label 

on the tank. 

   5.2.    Open the oil filler neck 

D

 by turning to the left. 

   5.3.    Pour the oil till oil level gauge 

B

 shows a ¾ fill. 

   5.4.    Now you close the oil level neck 

D

 by turning to the right. 

6.  Close the decompression valve 

E

 by turning to the right till you reach stop (the valve must be 

closed completely). 

7.  Turn the cut off cock 

F

 in position II. 

8.  Now you connect the compressed air to compressed air outlet 

G

 

ATTENTION:  A maximum of 15 bar compressed air may not be exceeded! 

9.  Afterwards turn the previously elevated filter pressure regulator 

H

 to the right till you feel a 

stop (filter pressure regulator now is opened to maximum).                                               

10.  Put the plug 

F

 in position I.   

11.  The pump will start and should bulid up to 400 bar pressure (if not, check the air pressure). 
12.  After reaching pressure of 400 bar on the display unit 

A

 put plug 

F

 in position II again. 

ATTENTION:  Nozzle test plant blocked at 400 bar! 

13.  The value on the indicator 

should not drop down. This means the high pressure pump is 

fully functional. 

14.  Open decompression valve 

E

 by turning left. 

15.  The pressure will drop to 0 bar on indicator 

A

2.2  Working with the nozzle test bed 

1.  The pressurization of the device under test must be tested against the allowance of the 
       manufacturer of the nozzle.    
2.     Start with position 2. to 7. 
3.  Attach screw in unit to injector body and lock.   
4.  Connect hose to screw in unit. 
5.  Apply screw in unit to injector body and lock. 
6.  Swivel in oil collection container under injection nozzle. 
7.  Place plug 

F

 in position I.   

8.  Examine the gunning chart of the injection nozzle in oil collection container 

I.

 

9.  After checking turn plug 

to the basic position. The pump will stop. 

10.  Now open decompression valve by turning left. Pressure indicator 

A

 will drop to 0 bar. 

11.  Thereafter open the hose on the screw in unit of the injection nozzle and you can remove it 

from the injection nozzle. 

12.  Now you can start again to check other injection nozzles. 
13.  Should the injection nozzle be defect, that the jet needle needs to be replaced, this can be 

done: 

Содержание GERUTEST NTB3

Страница 1: ...GERUTEST NTB3 operating manual for nozzle test bed GERUTEST NTB3 001 153 000 11 49024 0095 Version 2 0 Datum 08 06 2017 GERUS Apparatebau GmbH Co KG Engelschalkstrasse 16 D 86316 Friedberg e mail inf...

Страница 2: ...ration of conformity We the company GERUS Apparatebau GmbH CO KG Engelschalkstrasse 16 86316 Friedberg Germany declare hereby that the following described machine in its conception construction and fo...

Страница 3: ...oren von der Verordnung nur are only concerned by the regulation as als nachgeschalteter Anwender betroffen downstream user and therefore we are sind und daher nicht zur Registrierung not bound to reg...

Страница 4: ...nd 6 3 Risikoanalyse 7 4 lwechsel an der Hochdruckpumpe 7 5 Technische Daten 8 6 Kundendienst und Selbsthilfe 8 Index of contents 1 Description of Operation 9 2 Starting and shutdown 10 2 1 Operation...

Страница 5: ...h eine Sicherheitsbegrenzung auf der Niederdruckseite gew hrleistet vgl 1 Risikoanalyse Zum Betrieb wird die Pressluftversorgung 15 bar an das GERUTEST angeschlossen die Anzeigen berpr ft und der Star...

Страница 6: ...ilterdruckregler ist nun maximal ge ffnet 10 Legen sie nun den Absperrhahn F in Stellung I 11 Die Pumpe startet und sollte nun bis 400 bar Druck aufbauen falls nicht berpr fen Sie bitte den Luftdruck...

Страница 7: ...Niederdruckkreislauf ausgeschlossen 3 Leckagen oder Leitungsbr che am Hochdrucksystem sind mit keinen unmittelbaren gesundheitlichen Risiken f r den Bediener verbunden 4 Leitungsbr che bedingen einen...

Страница 8: ...rauch 0 53 m min bei 6 bar Druckluft 0 37 dm min bei 1000 bar 1 23 m min bei 6 bar Druckluft 0 90 dm min bei 0 bar 6 Kundendienst und Selbsthilfe Wenn wie unter Punkt 2 1 13 beschrieben der Betriebsdr...

Страница 9: ...through safety limitation on the lower pressure side see 1 risk analysis For operating the compressed air feed pressure 15 bar will be connected to GERUTEST the display verified and start lever revers...

Страница 10: ...r pressure 12 After reaching pressure of 400 bar on the display unit A put plug F in position II again ATTENTION Nozzle test plant blocked at 400 bar 13 The value on the indicator A should not drop do...

Страница 11: ...UTEST cannot build the required pressure within short time the device is defect The device has to be stopped otherwise the available oil will be extracted through continuous operation to the body cham...

Страница 12: ...nsumption 0 53 m min for 6 bar compressed air 0 37 dm min for 1000 bar 1 23 m min for 6 bar compressed air 0 90 dm min for 0 bar 6 Service and self help If as described in point 2 1 13 operating press...

Отзывы: