![German pool GKH-24 Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/german-pool/gkh-24/gkh-24_operating-instructions-manual_2216558060.webp)
57
short circuit and overload
.
The on spot connection should refer to the circuit diagram, witch is stuck on the unit body
The model selection recommend table for air switch and power cable
1、
The power cable used in the unit is copper cable, the working temperature should notnot exceed the specified value.
2、
If the power cable is longer than 15meters, please enlarge the cross section of power cable adequately, in order to
avoid the accident due to overload.
Requirement for ground
Air conditioner is the I class electric appliance thus pleas
,
e do conduct reliable grounding measure
.
The yellow green tw
-
o color wiri
-
ng of air conditioner r is grounding wire and can not be used for
other purposes It cannot be cut of
.
f and be fixed by screw
,
otherwise it would cause electric shock
.
Theuser must offer the reliable grounding terminal
Please don't connect the grounding wire
.
to the following places
:
Water pipe
(1)
Gas pipe
(2)
Blowing pipe
(3)
(4) Other places that professional personnel consider them unreliable.
The section area of cables selected by users must not be smaller than the specifications show
.
diagram
:
Warning
3×4.0
H
RN F
07
-
3 1.0
×
H
VV F
05
-
5×2.5
H
RN F
07
-
H
VV F
05
-
5×4.0
H
RN F
07
-
3×1.0
H
VV F
05
-
3 1.0
×
C
ommunication Cords:
2
×0.75 (H05RN-F)
4.0/1.0
25/6
2.5/1.0
16/6
4.0/1.0
25/6
Model
Power
Supply
Capability
of Air
Switch A
( )
(
Outdoor
/
)
Indoor
Minimum
Sectional Area of
Earth Wire
(
/
)
Outdoor Indoor
Outdoor
power
supply
cord
mm
2
)
Indoor
power
supply
cord
mm
2
)
(
(
mm
2
)
(
220-240V
380-415V
3N~
50Hz
GKH-24
GKH-48
GKH-36
Содержание GKH-24
Страница 2: ......
Страница 4: ...1 1 Names and functions of parts indoor unit outdoor unit GKH 24 GKH 24 EXT...
Страница 5: ...2 indoor unit outdoor unit GKH 36 GKH 48 GKH 36 EXT GKH 48 EXT...
Страница 23: ...TIMER operation procedure 20...
Страница 25: ...How to inser t batteries 22...
Страница 37: ...7 Optimum operation 34...
Страница 39: ...The following are not troubles 36...
Страница 40: ...9 Installation notes This should be done by professional 37...
Страница 41: ...10 Care and maintenance Please cut off the power supply after you used the air conditioner 38...
Страница 66: ......
Страница 67: ...GKH 24 GKH 48 GKH 36...