GeoSIG AC-23 Скачать руководство пользователя страница 1

 

GeoSIG Ltd, Wiesenstrasse 39, 8952 Schlieren, Switzerland 

Phone: + 41 44 810 2150,  Fax: + 41 44 810 2350 

[email protected],  www.geosig.com 

 

 
 
 
 
 
 
 
 
 
 

 

User Manual 

 

AC-23 Accelerometer 

 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 

Author: 

Serge Rudaz 

Checked: 

Markus Epp 

Approved: 

Johannes Grob 

Distribution: 

GeoSIG Ltd (1), Customer on request 

 

Содержание AC-23

Страница 1: ...Schlieren Switzerland Phone 41 44 810 2150 Fax 41 44 810 2350 info geosig com www geosig com User Manual AC 23 Accelerometer Author Serge Rudaz Checked Markus Epp Approved Johannes Grob Distribution...

Страница 2: ...MAE 11 15 10 2014 Adjusted formatting of figures SER MAE 12 29 07 2015 Picture update PAT JON 13 07 05 2019 Mounting section updated VAG ALB 14 27 05 2019 P N correction on item 1 2 JOG TAB 15 20 03...

Страница 3: ...TRODUCTION 7 5 2 PRINCIPLE 7 6 ELECTRICAL CONFIGURATION 8 7 OFFSET ADJUSTMENT ERROR BOOKMARK NOT DEFINED 8 MOUNTING DOWNHOLE SENSOR 10 8 1 BOREHOLE PREPARATION 10 8 2 INCLINOMETER TUBE INSTALLATION 11...

Страница 4: ...zorb diodes and VDR Power supply 10 15 VDC Current drain Average 90 mA 15 VDC 2 Electrical Connector All the AC 4x accelerometers are supplied as standard with a 2 m connection cable Based on the inte...

Страница 5: ...tput 47 output impedance White 2 B OUTPUT X 0 V 10 V voltage output inverted 47 output impedance Brown 3 C OUTPUT Y 0 V 10 V voltage output 47 output impedance Green 4 D OUTPUT Y 0 V 10 V voltage outp...

Страница 6: ...e point levelling mechanism This may damage the sensor Figure 3 Sensor housing dimensions The accelerometer must be firmly mounted to a surface and levelled as the application requires Check to be sur...

Страница 7: ...lected by the user with jumpers 4 2 Principle The accelerometer is based on a geophone mass spring system with electronic correction This type of sensors gives a very good stability in temperature and...

Страница 8: ...HONE OUTPUT Feedback loop Amplifier Inverter Figure 5 TEST INPUT configuration 5 Electrical Configuration The full scale can be adjusted without gain re calibration by means of jumpers with fixed 0 1...

Страница 9: ...DVM as shown on the above figure and adjust the offset potentiometers so that the DVM readings stay within the ranges indicated in the following table according to the sensor output range given in Se...

Страница 10: ...it could be required to drill a higher dimension hole and to implement a 120 mm PVC casing to insure a free path when the inclinometer tube is inserted in the borehole 8 1 Borehole preparation Note Do...

Страница 11: ...wing The number of sections is only an example Figure 9 Inclinometer tube installation 30 cm Inclinometer tube in 3 meters section Coupling elements fixed with pop rivets Must be fully sealed to avoid...

Страница 12: ...drawing The number of sections is only an example Figure 10 Sensor Installation About 70 cm Sand 50 cm Guiding system Sensor AC 23 DH diameter 54 mm Cable Concrete sealing of sensor At least 1 meter...

Страница 13: ...of 3 The functional limit for the sensor is 9 The water level in the inclinometer tube should be maximum 50 meters including fast elevation due to heavy rain It is recommended to use the optional asse...

Страница 14: ...meter User Manual 11 08 2022 V17 14 15 GS_AC 23_UserManual_V17 The following elements will be inserted in the borehole Figure 12 Torpedo the sensor and its cable Figure 13 Guiding system Figure 14 Inc...

Страница 15: ...ed before the insertion The engraved mark on bottom cover is showing the positive direction of X axis View for top 9 Installation Verification Please note that temperature compensation device is mount...

Отзывы: