Page 51/55
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
RXE-1000 / 17
14.
FINAL INSPECTION
Once installation has been completed, the following aspects in particular must be inspected:
a)
Are the support, U-ropes and transmission ropes and the lateral rope connected to the correct anchors?
b)
Are the rope guides at the top and bottom of the posts installed correctly?
c)
Have the correct number of rings been left free on the left and right of the posts?
d)
Is the net correctly fastened to the support ropes / U-ropes?
e)
Have the correct number of wire rope clips been attached to the ends of the rope?
f)
Are the wire rope clips installed correctly?
g)
Has the correct torque been applied to the wire rope clips?
h)
Are the nets connected correctly?
i)
Are the end nets correctly fastened to the vertical ropes?
j)
Is the sag of the top support rope less than 3% of the distance between the posts?
Содержание RXE-1000
Страница 2: ...Page 2 55 Geobrugg AG CH 8590 Romanshorn Switzerland RXE 1000 17 ...
Страница 3: ...Page 3 55 Geobrugg AG CH 8590 Romanshorn Switzerland RXE 1000 17 ...
Страница 52: ...Page 52 55 Geobrugg Gruppe CH 8590 Romanshorn Switzerland RXE 1000 17 ...
Страница 53: ...Page 53 55 Geobrugg AG CH 8590 Romanshorn Switzerland RXE 1000 17 ...
Страница 54: ...Page 54 55 Geobrugg Gruppe CH 8590 Romanshorn Switzerland RXE 1000 17 ...