GenTran OVATION ATS1001D Скачать руководство пользователя страница 26

 

26 

(i.e. air conditioning compressor and air handler fan), turn ON all branch circuit breakers for managed load. For installer 
safety, 1 lighting circuit may be left ON to illuminate the transfer switch installation and/or egress areas. 

c.

 

Turn ON all appliances managed by a PowerPause™ Load Management Module. For air conditioning systems, set 
thermostat to COOL and AUTO and low enough to close the 24VAC thermostat control circuit. For electric hot water 
heaters, turn UP the thermostat to keep the heating elements on. 

3.

 

Enter PowerPause™ Load Management Module 

learning mode by pressing and holding down the SERVICE  and RESET button 

until all LEDs flash in numeric sequence. Release SERVICE and RESET buttons. If no Load Management Modules are detected, the 
programming mode is terminated and the transfer switch resumes normal operation. NOTE: Exit 

learning mode at any time by 

pressing RESET.  See Figure 5.1. 

 All PowerPause

 Load Management Module programmed values are erased and reset to zero (0) when 

entering 

learning mode. Exiting or terminating learning mode before values more than zero (0) have been stored will disable 

PowerPause

 Load Management Module operation. 

4.

 

Generator will start, run for 15 seconds, stabilize output and transfer loads to generator power. The controller will automatically 
detect each PowerPause™ Load Management Module installed and power off all managed loads. 

5.

 

LEDs1-5 will flash for 10 seconds. If you prefer to have the controller automatically

 learn the size of each managed load, continue 

to step 6. NOTE: Entering the automatic

 learning mode will erase all previously learned loads from the controller memory. If you 

need to change 1 or 2 loads, enter the manual 

learning mode instead. To enter the manual learning mode, press TRANSFER while 

LEDs 1-5 are flashing and proceed to Step 10. NOTE: If LED flashing does not occur, reduce the safety lighting loads in Step 
6.4.1.b until LEDs 1-5 start flashing. 

6.

 

LED 1 (GREEN) will begin slow flashing indicating the controller automatically detected a Load Management Module in position 
1-2 and is ready to learn the size of priority 1 load. LED 1 will continue slow flashing for 20 seconds while Load 1 turns on and 
runs. At the end of 20 seconds, the load will turn off. 

7.

 

If the load 1 

learning is successful, LED 1 will turn on for 5 seconds. If load 1 learning is not successful (load exceeded 85% of 

generator capacity or no load detected), LED 1 will fast flash for 5 seconds and the load is disqualified and not allowed to operate 
on generator power. Note the LED fast flash condition. 

8.

 

Steps 5 -7 will be automatically repeated for each detected  load. LED 1 & 5 will flash for priority 6 load.  

9.

 

When all detected loads have been 

learned, LEDs 1-5 turn on. Press RESET to terminate the automatic programming mode. 

Automatic load 

learning is now complete. Go to Step 10 if disqualified loads from Step 7 require manual learning, otherwise go to 

6.5. 

10.

 

Use the manual 

learning mode when the automatic learning in Steps 6-9 does not work or when existing learned loads require 

changing.  Refer to step 5 to enter manual learning mode. 

11.

 

The LED corresponding to the first installed load module will begin flashing. Press TRANSFER to scroll to the desired load to 

learn.  

12.

 

Press EXERCISE to start load 

learning for the selected load. The LED will light for 5 seconds, then slow flash for 20 seconds.  If the 

load 

learning is successful, the LED will turn on. If the load learning is not successful (load exceeds 85% of generator capacity or 

no load detected), the LED will fast flash and the load is disqualified and not allowed to operate on generator power.  Note the 
LED fast flash condition.  Press TRANSFER to scroll to the next load to learn & repeat Steps 12 as required. Press RESET to exit 
manual 

learning mode. 

13.

 

If programming PowerPause Load Management Modules is still not successful, contact GenTran for assistance at 1-888-GEN-
TRAN. 

 
6.5  Re-Installing Covers and Labeling Circuits 

1)

 

Determine where branch circuit breakers have been installed and remove the required dead-front twist-outs. All dead-front 
openings must be covered with circuit breakers or with filler plates. Order GenTran PN 51022 for additional filler plates. 

2)

 

Install dead front cover on enclosure with screws provided. For Models 1001 and 2001, any excess openings between circuit 
breakers and twist out openings must be corrected by adjusting the two screws on the inside of door or adjusting the depth of the 
box. 

3)

 

Apply circuit directory labels next to circuit breakers and identify each branch circuit. If the transfer switch is used as Service 
Equipment, apply “SERVICE DISCONNECT” label next to the UTILITY MAIN circuit breaker.  UTILITY MAIN and GENERATOR MAIN 
are already labeled. 

 

6.6  Generator Battery Monitoring 

Generator battery failure is the most common cause for generator startup failure. The OVATION™ Series ATS monitors the battery 
output during generator startup and if below minimum specifications, will continuously flash LED 2 and 5 alerting the user to further 
test and service the generator battery.  NOTE:  Generator may not start if LEDs 2 and 5 are flashing. 
 

Содержание OVATION ATS1001D

Страница 1: ...n MODEL NUMBER ___________________________________SERIAL NUMBER ________________________________________________________ DATE OF INSTALLATION ______________________________DEALER NAME PHONE __________...

Страница 2: ...roduct or property damage This symbol refers to a hazard or unsafe practice that can result in severe personal injury or death This symbol warns of immediate hazards that will result in severe persona...

Страница 3: ...TS 20 4 4 Connecting the Low Voltage Cable to the Generator 21 4 5 Installing and Wiring PowerPause Load Management Modules 21 SECTION 5 PROGRAMMING THE SYSTEM 23 5 1 Setting Generator Size 23 5 2 Set...

Страница 4: ...ure Eliminates the need for a separate sub panel significantly reduces installation time expense and complexity Load center accepts interchangeable type circuit breakers from Siemens Square D Cutler H...

Страница 5: ...e 22K 22K 10K 22K available Dimensions HxWxD 24 x14 31 x3 93 28 x14 5 x4 25 42 x14 31 x3 93 41 x14 5 x4 25 23 5 x18 5 x4 25 Weight LBS 28 27 46 43 23 22K AIC rating available order 22 suffix It is ina...

Страница 6: ...ait for possible successful utility power grid re strike approx 15 seconds before the load is transferred to generator power At the time of load transfer to generator power all appliances connected to...

Страница 7: ...rPause connected appliances again 4 During the utility power failure the generator will continue to power the load until it either runs out of fuel gasoline propane or diesel powered gensets or until...

Страница 8: ...odel LSM Not shown ATSRK Relay Kit Control Module Generator Main 200 Amp Drive Motor Assembly Neutral Bar Ground Bar Circuit Breaker Spaces 4 To Set Generator Size To Set Exercise Schedule Model ATS20...

Страница 9: ...uit breakers are mechanically interlocked to prevent simultaneous UTILITY and GENERATOR power source feeds Interlocks are automatically moved by a computer controlled actuator and motor which may move...

Страница 10: ...20or 30 amp circuit breakers is designed to protect devices connected to the transfer from surges coming in from the power lines 1 6 Standards Compliance OVATION Series ATS systems have been tested a...

Страница 11: ...m content support installation_instructions asp see Ovation Series ATS Generator Connection Diagrams for additional information 2 2 Compatible Circuit Breakers Each OVATION Series ATS has been configu...

Страница 12: ...RK for generator control See Section 2 1 if required 3 2 Unpacking Inspection After unpacking carefully inspect the transfer switch for shipping damage Shipping Damage is not warranted Contact the fre...

Страница 13: ...y position 1 with the air handler continuously connected to generator power air will continue to circulate within the house Continuing with the example let s say the second priority appliance is a 30...

Страница 14: ...agement Module and Relay Box are Refrigerators and freezers Aquariums Central heating systems gas oil electric Furnace fan air handler Sump pumps Septic lift pumps Pool and spa anti freeze pumps Medic...

Страница 15: ...damage or a future malfunction This device should be installed in accordance with all local codes standards and regulations and the latest edition of the National Electrical Code Do not allow petroleu...

Страница 16: ...16 INTERNAL WIRING DIAGRAMS MODELS ATS2001D R Diagram 4 2...

Страница 17: ...17 INTERNAL WIRING DIAGRAMS MODEL ATS2002R Diagram 4 3...

Страница 18: ...de proper protection to conductor insulation For more information on wire size and ampacity ratings see NEC Article 310 Table 310 16 The OVATION Series ATS have been UL Listed for use with Copper or A...

Страница 19: ...per or AL wire 6 Install and connect appropriately sized wire from the generator to the terminals marked GENERATOR MAIN If installing the Current Sense Cable provided with the optional PowerPause Load...

Страница 20: ...nsfer switch on the control module There is a small black 4 position terminal connector delivered plugged into J6 on the Control Module that is labeled to indicate how to connect the low voltage cable...

Страница 21: ...odule from transfer switch Refer to Figure 4 1 1 3 a Remove branch circuit breaker if installed opposite controller module b Slide Control Module towards circuit breaker bus stabs towards center of en...

Страница 22: ...a Line up Control Module to breaker bus stabs from where removed in step 1 b Hold at 30 angle push onto bus stabs c Lower outside end flush with enclosure d Slide Control Module towards enclosure out...

Страница 23: ...ERATOR EXERCISE SCHEDULE and use provided small straight blade screwdriver to rotate the dial to the desired schedule See Table 5 2 to determine model Once set the OVATION Series ATS will initiate a g...

Страница 24: ...TOP Starts and stops generator To start generator press once To stop generator press twice Will override all generator and transfer switch time delays EXERCISE Starts generator exercise cycle During t...

Страница 25: ...system switch key to ON 6 Set generator AUTO MANUAL OFF switch to AUTO 7 Press SERVICE button Generator start sequence will begin and runs for 5 minutes 6 3 Testing the Transfer Switch 1 Turn OFF the...

Страница 26: ...load is disqualified and not allowed to operate on generator power Note the LED fast flash condition 8 Steps 5 7 will be automatically repeated for each detected load LED 1 5 will flash for priority 6...

Страница 27: ...out of range 4 Utility power restored genset power not required 5 Total loads exceed 85 of genset continuous rating 6 Largest load exceeds genset continuous rating 1 Reset circuit breaker on genset 2...

Страница 28: ...ing 1 Battery may be defective 2 Incorrect battery charger output 1 Check battery voltage a reading of 8 VDC or less after 24 hours of charging indicates that battery needs replacement 2 Check battery...

Страница 29: ...cover products that have been subject to misuse or unauthorized repair NOTE TO INSTALLER Please provide your company name and phone number inside the front door so that the customer will be able to co...

Страница 30: ...D modified Siemens 20 20 B 22 2 51008 Circuit breaker 100A 2 pole 120 240V 10K AIC B 22 22 1 510081 Circuit breaker 100A 2 pole 120 240V 22K AIC B 23 1 51037 Warranty Reply Card Product Registration n...

Страница 31: ...19 22 1 510081 Circuit breaker 100A 2 pole 120 240V 22K AIC B 20 1 51037 Warranty reply card not shown A 21 1 51080 Options Order Sheet not shown A 22 1 51147 Label GENTRAN silver green 340 not shown...

Страница 32: ...d loadcenter 40 40 B 20 1 51037 Warranty reply card not shown A 21 1 51102 Circuit breaker 125A 2 pole 120 240V B 22 1 51147 Label GENTRAN silver green 340 not shown A 23 1 72006 Label Gen Util not sh...

Страница 33: ...cuit breaker 125A 2 pole 120 240V 10K AIC B 21 1 51147 Label GENTRAN silver green 340 not shown A 22 1 72006 Label Gen Util not shown A 23 2 72009 Label SN not shown A 24 1 72010 Label SN controller n...

Страница 34: ...8AWG B 25 1 51037 Warranty reply card not shown A 26 1 51080 Options Order Sheet not shown A 27 2 51101 Circuit breaker 200A 2 pole 120 240V 10K AIC B 27 22 1 511011 Circuit breaker 200A 2 pole 120 24...

Страница 35: ...p 2 circuits 240 VAC Includes 2 relays PP50 1 PowerPause Relay Box 50 Amp 1 circuit 240 VAC Includes 1 relay PP50 2 PowerPause Relay Box 50 Amp 2 circuits 240 VAC Includes 2 relays ATSRK Relay Kit One...

Страница 36: ...ran com Customer Service Hours 8 00 a m until 5 00 p m Eastern Time Monday Friday 07 16 10 PN 530001 Rev D Copyright 2008 2010 Gen Tran Corporation All rights reserved GenTran and the GenTran Logo are...

Отзывы: