![Genie GR-26J Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/genie/gr-26j/gr-26j_operators-manual_2211835051.webp)
Fourth Edition • First Printing
Operator's Manual
Transport and Lifting Instructions
Part No. 1307950GT
GR-26J
49
Transport and Lifting Instructions
Observe and Obey:
Genie provides this securement information as
a recommendation. Drivers are solely
responsible for making sure machines are
properly secured and the correct trailer is
selected pursuant to US Department of
Transportation regulations, other localized
regulations, and their company policy.
Genie customers needing to containerize any
lift or Genie product should source a qualified
freight forwarder with expertise in preparing,
loading and securing construction and lifting
equipment for international shipment.
Only qualified mobile elevating work platform
operators should move the machine on or off
the truck.
The transport vehicle must be parked on a
level surface.
The transport vehicle must be secured to
prevent rolling while the machine is being
loaded.
Be sure the vehicle capacity, loading surfaces
and chains or straps are sufficient to withstand
the machine weight. Genie lifts are very heavy
relative to their size. See the serial label for
the machine weight. See the inspections
section for the serial label location.
The machine must be on a level surface or
secured before releasing the brakes.
Do not drive the machine on a slope that
exceeds the uphill, downhill or side slope
rating. See Driving on a Slope in the Operating
Instructions section.
If the slope of the transport vehicle bed
exceeds the uphill or downhill maximum slope
rating, the machine must be loaded and
unloaded using a winch as described in the
brake release operation. See the
Specifications section for the slope ratings.
Brake Release Operation
1
Chock the wheels to prevent the machine from
rolling.
2
Be sure the winch line is properly secured to
the drive chassis tie points and the path is
clear of all obstructions.
3
Locate the brake release
toggle switch under the ground
controls side turntable cover.
4
Move the brake release toggle switch to the
right to release the brakes. An alarm will
sound and no function will operate.
After the machine is loaded:
1
Chock the wheels to prevent the machine from
rolling.
2
Move the brake release toggle switch to the
left to reset the brakes.
Note: Failure to reset the brakes will completely
discharge the battery and may result in battery
damage and may require a complete battery pack
replacement.
Содержание GR-26J
Страница 10: ...Operator s Manual Fourth Edition First Printing General Safety 8 GR 26J Part No 1307950GT General Safety ...
Страница 11: ...Fourth Edition First Printing Operator s Manual General Safety Part No 1307950GT GR 26J 9 ...
Страница 12: ...Operator s Manual Fourth Edition First Printing General Safety 10 GR 26J Part No 1307950GT ...
Страница 13: ...Fourth Edition First Printing Operator s Manual General Safety Part No 1307950GT GR 26J 11 ...
Страница 14: ...Operator s Manual Fourth Edition First Printing General Safety 12 GR 26J Part No 1307950GT ...
Страница 15: ...Fourth Edition First Printing Operator s Manual General Safety Part No 1307950GT GR 26J 13 ...
Страница 27: ...Fourth Edition First Printing Operator s Manual Controls Part No 1307950GT GR 26J 25 Platform Control Panel ...
Страница 40: ...Operator s Manual Fourth Edition First Printing Inspections 38 GR 26J Part No 1307950GT ...
Страница 42: ...Operator s Manual Fourth Edition First Printing Inspections 40 GR 26J Part No 1307950GT ...
Страница 59: ......