background image

5a.

   Elevate powerhead assembly and position door 

end rail section (C) inside bracket.

NOTE

:  

Support powerhead and have a second  

person assist during this step.

5b.  

Align holes in rail with holes in bracket.

5c.  

Slide clevis pin through holes in rail and  

bracket and secure with speed nut by  

pressing the speed nut ends together.

5d.  

Slide carriage near the powerhead.

Protective 

foam cushion

C

5a

Header 

bracket

5b

5c

Speed nut

Speed nut

Clevis pin, long

AttAChInG rAIl to  

brACKet    

(OrANGE BAG)

6a.

   If possible, lift and support powerhead while a second person  

fully opens the door. 

Insert a 2" x 4" board, cardboard or  

towel between door and rail, to protect door. 

Position  

powerhead over the centerline of door and allow it to rest on  

board. Otherwise, measure and mark ceiling 115" back from the  

header, aligned with the centerline of the door.

6b.

   Angle the mounting straps (G) and attach to joists  

with two 5/16" x 1-3/4" lag screws provided in the 

green bag. For finished ceilings, attach a cross-piece 

(not supplied)

 to joists using lag screws and secure 

mounting straps to the cross-piece with 5/16"-18 

bolts and nuts 

(not supplied)

.

6c.

   Raise powerhead unit so that there is sufficient  

clearance between door and rail. Cut or bend  

mounting straps as needed to align with the  

powerhead and level rail.

6d.

   Secure powerhead to mounting straps using 5/16"-18 

- 3/4" bolts and nuts provided in green bag. Ensure 

powerhead is centered with the door and 

remove  

the 2"x 4" board and/or other protective material.

6a

NOTE: Rail should be level to floor. For tall garage 

ceilings additional hanging angle and hardware 

may be required and is available at leading 

retail stores. 

Door Track

Door

Protective material to prevent 

damage to the door 

115"

Door 

centerline

Cross piece

location

115"

G

5/16" x 1-3/4" Lag screw

5/16"-18

bolts 

& nuts

6b

Lag screw

Cross piece

(not supplied)

(not supplied)

Hidden

joists

 

5/16" - 

18 - 3/4"

Bolt 

6d

Attach

to joists 

Lag screws

 

5/16" - 

18 - 3/4"

Bolt 

5/16" - 18 - 3/4"

Bolt 

5/16" - 18

Nut 

6d

Lag screws

mountInG poWerheAd  

to CeIlInG      

(GrEEN BAG)

Open Beam Ceiling

Finished Ceiling

Squeeze ends of speed nut to  
install on pin.

Содержание Chain/Belt Drive Models

Страница 1: ...uch as wood block steel brackets cables or other like items Repairs and adjustments must be made by a trained door system technician using proper tools and instructions WAR NI NG An Electrical Shock could result in serious injury or death Turn off power before removing operator cover When replacing cover make sure electrical wires are not pinched or near moving parts Operator must be properly grou...

Страница 2: ...t x2 3 8 16 7 8 Bolt x2 1 4 14 5 8 Tapered flange screw x4 Speed Nut 1 4 x 1 1 4 Lag screw x4 Parts List A Powerheadendrailsection B Middle rail section C Door end rail section D Door arm curved E Powerhead lens cover F Powerhead G Rail mounting bracket H Mounting straps I Rail mounting bracket belt drive J Rail connector L Safe T Beam and wall console wire M Remote N Wall console O Wireless keypa...

Страница 3: ... to fasten assembly to the rail 1a 1b 1c 1d 1e 1f A B J C B C J C J J A C B A Drive gear assembly 1g A Slots Thedrivegearassemblyislooseandmustbepulledtowardstheslots andfastened Becertainthetensionbracketishookedontotherail asshowninillustration2c 1f HEAD OF PIN SIDEVIEW SHOULD PULLEY PIN FALL OUT Note orientation of pin It is inserted from the bottom head positioned between rail and pulley assem...

Страница 4: ...highest point of door travel 1 Get on a ladder to the side of your garage door 2 Have someone lift the door open slowly 3 As the door is raised find the highest point where the door extends above the door tracks that is the highest point of door travel For sectional doors this is typically where the top door roller exits the curved portion of the track onto the horizontal section as the door is ra...

Страница 5: ...en bag For finished ceilings attach a cross piece notsupplied to joists using lag screws and secure mounting straps to the cross piece with 5 16 18 bolts and nuts notsupplied 6c Raise powerhead unit so that there is sufficient clearance between door and rail Cut or bend mounting straps as needed to align with the powerhead and level rail 6d Secure powerhead to mounting straps using 5 16 18 3 4 bol...

Страница 6: ...rline Door centerline 7d Sectional Wooden 7d Sectional Typical 7e Top of door ATTACHING DOOR BRACK ET ATTACHING DOOR ARM TO DOOR BRACKET SHUTTLE BLUE BAG Release handle Orange Bag K G 8a Secure emergency release handle orange bag to cord 8b Using the emergency release cord disengage the shuttle carriage and move it toward the door about 16 from the header 8c Sectional Doors typically accept curved...

Страница 7: ...ontrol wire tube BOTTOMVIEW 9f To sensors 1 2 3 4 Sensor Source 9e To powerhead INSTALLING SAFE T BEAM YELLOW BAG 10a Use garage pre wiring if available Otherwise route wire L from powerhead to the desired location for the wall control Secure wire with insulated staples green bag 10b On the powerhead insert wire down through the control wire tube Remove 1 4 insulation from white and striped wire U...

Страница 8: ...ian 12a Cut existing wires OUTSIDE CHASSIS 12b The wire connections must be made INSIDE CHASSIS and there must be at least 6 of new power supply line wire INSIDE CHASSIS Conduit is optional Conduit strain relief and wire nuts are not provided WA RNING Operatorisequippedwithgroundedelectricalplugforyourprotection andonlyfitsgroundedelectrical outlets DONOTalterpluginanyway Ifyouhavenogroundedoutlet...

Отзывы: