NOTE:

Even if the generator is running smoothly at this 

point, a drop in gas pressure indicates that the sup-

ply is barely adequate to supply the generator’s 

needs. Changes in the generator load, or additional 

gas demand by other appliances may affect the gen-

erator’s performance. Verify gas pressure and pipe 

sizing. Unhook the manometer and reinstall the port 

plug. 

GENERATOR TESTS UNDER LOAD

1.  Test the generator with electrical loads applied, start 

by placing all of the breakers on the Alternative Power 
Management System into the OFF or open position.

2.  The disconnect switch recommended to be installed at the 

generator input to the Alternative Power Management System 
should be switched to OFF or Open position.

3.  Place the main Circuit Breaker on the generator in the ON or 

closed position.

4.  Set the AUTO/OFF/MANUAL switch to MANUAL.  The 

generator should crank and start immediately.  Let the engine 
stabilize and warm up for a few minutes.

5.  Check voltage and frequency at the disconnect switch 

installed between the generator and the Alternative Power 
Management System.

6.  If the appropriate voltage and frequency are present, close the 

disconnect switch.

7.  Check voltage and frequency at the Alternative Power 

Management System by closing the breakers one at a time. (if 
applicable)

8.  Let the generator run under load for 20-30 minutes while 

listening for any unusual noises, vibration or other indications 
of abnormal operation such as oil leaks or overheating.

9.  With the generator carrying the entire priority load, recheck 

gas pressure to verify that it is at the same level it was before 
the generator was started.

10. When completed, open the disconnect switch and allow the 

generator to run at no load.

11. Place the AUTO/OFF/MANUAL switch into the OFF position.  

The generator will shut down.  Return to the disconnect 
switch and place it in the ON or closed position.

CHECKING AUTOMATIC OPERATION

1.  To check the automatic operation, place the AUTO/OFF/ON 

switch to the AUTO position.

2.  Verify the remote two-wire start test switch that’s installed 

near the Alternative Power Management System is set to the 
ON or closed position.  This will cause the generator to start 
automatically.

3.  With the generator running and powering loads, set the 

remote two-wire start test switch to the OFF or open position.  
In approximately one minute the generator will automatically 
shut down.

Содержание ECOGEN SERIES

Страница 1: ...INSTALLATION GUIDELINES ECO GEN Series 6kW Air cooled Generators...

Страница 2: ...such as Induction Motors sump pumps refrigerators air conditioners furnaces etc Electronic Components computer monitor TV etc Lighting Loads and Microwaves READ THIS MANUAL THOROUGHLY If any portion o...

Страница 3: ...n be copied and posted near the unit s installation site Safety should be stressed to all operators and potential operators of this equipment Study these SAFETY RULES carefully before installing opera...

Страница 4: ...ICAL SHOCK MAY RESULT The National Electrical Code NEC requires the frame and external electrically conductive parts of the generator to be connected to an approved earth ground Local electrical codes...

Страница 5: ...r signature under the consignor s memo of loss or damage If a loss or damage is noted after delivery separate the damaged materials and contact the carrier for claim procedures Concealed damage is und...

Страница 6: ...e generator on all sides Make sure the generator is level within inch 6 Connect an approved ground strap to the grounding lug on the base frame and to an approved earth ground or grounding rod as spec...

Страница 7: ...e generator does not cause a gas leak at one of the connection points so it s important that the line be installed with as few bends as possible 5 Never bend the flexible fuel line to avoid using an e...

Страница 8: ...This switch would allow for testing of the 2 wire start function on the generator 1 Pop the metal cover circle off the back of the generator enclosure 2 Remove the metal cover from the controller Loca...

Страница 9: ...OOTING Display Reads Use ARROW keys to scroll and find the first number of your Activation Code Press ENTER to select Repeat this step until all digits have been entered Use ESCAPE to correct previous...

Страница 10: ...purchasing a battery for the generator refer to the Owner s Manual for the recommended battery Group 26R 12 Volt 525cca minimum 2 Follow all of the procedures and safety precautions in the generator...

Страница 11: ...ppropriate voltage and frequency are present close the disconnect switch 7 Check voltage and frequency at the Alternative Power Management System by closing the breakers one at a time if applicable 8...

Страница 12: ...10 Electrical Data Schematic Oil System Drawing No 0J1323 C...

Страница 13: ...E SENSING AC DISTRIBUTION PANEL 120 240V DC DISTRIBUTION PANEL 12V 24V 48V BATTERY 12V 24V 48V INVERTER CHARGER GENERATOR HOUSE HOUSE LOADS HOUSE LOADS 120V 240V CHARGER SUPPLY TWO WIRE START TWO WIRE...

Страница 14: ...12 Installation Diagram Drawing No 0J1320 A...

Страница 15: ...13 Drawing No 0J1320 A Installation Diagram...

Страница 16: ...14 Installation Diagram Drawing No 0J1320 A...

Страница 17: ...15 Notes...

Страница 18: ...16 Notes...

Страница 19: ...17 Notes...

Страница 20: ...Part No 0J1322 Revision A 10 14 10 Printed in U S A...

Отзывы: