6.  When finished checking the gas pressure, close the manual 

shutoff valve.

2.  Remove the knockout in the back of the connection box, feed 

the wires through the back of the box and secure the conduit 
with the lock nut.

 

Seal the hole with silicone caulk. Don’t forget to caulk the hole 
inside the house as well.

4.  Replace the protective cover plate and retaining screw, and 

lock the connection box.

5.  For 10-20 kW models, locate the metal hasp that is packaged 

in the owner’s manual bag. Insert the hasp in the slot located 
on the left side of the external circuit breaker box. Be sure that 
the clip of the hasp is facing toward the front of the generator. 
If desired, lock the external box.

General Information

Содержание Air-cooled Generators

Страница 1: ...com or 1 888 GENERAC NOT INTENDED FOR USE IN CRITICAL LIFE SUPPORT APPLICATIONS ONLY QUALIFIED ELECTRICIANS OR CONTRACTORS SHOULD ATTEMPT INSTALLATION DEADLY EXHAUST FUMES OUTDOOR INSTALLATION ONLY THIS MANUAL MUST BE USED IN CONJUNCTION WITH THE OWNERS MANUAL ...

Страница 2: ...as Induction Motors sump pumps refrigerators air con ditioners furnaces etc Electronic Components computer monitor TV etc Lighting Loads and Microwaves If any portion of this manual is not understood contact the nearest Dealer for starting operating and servicing procedures Throughout this publication and on tags and decals affixed to the generator DANGER WARNING CAUTION and NOTE blocks are used t...

Страница 3: ...r suggests that these rules for safe operation be copied and posted near the unit s instal lation site Safety should be stressed to all operators and potential operators of this equipment Study these SAFETY RULES carefully before installing operating or servicing this equipment Become familiar with this Owner s Manual and with the unit The generator can operate safely efficiently and reliably only...

Страница 4: ...UTO OFF MANUAL switch to its OFF position before working on equipment and remove the 7 5A fuse from the generator control panel In case of accident caused by electric shock immediately shut down the source of electrical power If this is not possible attempt to free the victim from the live conductor AVOID DIRECT CONTACT WITH THE VICTIM Use a nonconducting implement such as a dry rope or board to f...

Страница 5: ...due to backfeed of electrical energy If any loss or damage is noted at time of delivery have the person s making the delivery note all damage on the freight bill or affix their signature under the consignor s memo of loss or damage If a loss or damage is noted after delivery separate the damaged materials and contact the carrier for claim procedures Concealed damage is understood to mean damage to...

Страница 6: ...rator Cover with polyurethane film and fill with pea gravel or crushed stone Compact and level the stone A concrete pad can be poured if desired 3 Inspect the generator for shipping damage and if necessary file a claim with the shipper Remove the bands holding the generator to the wooden pallet 4 Make sure the lifting equipment to be used has sufficient capacity to safely handle the weight of the ...

Страница 7: ...ator and locate the selector tab on the air box cover Insert the pin end into the hole in the selector tab and pull outward to overcome spring pressure Then twist clockwise 90 degrees and allow the selector to return in once aligned with the LP position 3 On 10 kW units open the roof loosen the forward clamp on the air inlet hose and slide the hose away from the hose fitting 4 Slide the fuel selec...

Страница 8: ...ed section of UL Listed or AGA approved flexible fuel line in accordance with local regulations The purpose of the flexible fuel line is to ensure that vibration from the generator does not cause a gas leak at one of the connection points so it s important that the line be installed with as few bends as possible Installing a sediment trap is also recommended 4 Never bend the flexible fuel line to ...

Страница 9: ...k Don t forget to caulk the hole inside the house as well 4 Replace the protective cover plate and retaining screw and lock the connection box 5 For 10 20 kW models locate the metal hasp that is packaged in the owner s manual bag Insert the hasp in the slot located on the left side of the external circuit breaker box Be sure that the clip of the hasp is facing toward the front of the generator If ...

Страница 10: ...pre wired and connected to the generator no additional connections are necessary at the generator Skip the following section and proceed with Appendix A EZ Switch Installation Operational Testing 2 If the EZ Switch was purchased separately from the generator the 5 seal tite whip will need to be connected to the generator To complete the wiring run the conduit for the power leads and control wires ...

Страница 11: ...m or call 1 888 9ACTIVATE 922 8482 If you already have your activation code wait 3 5 seconds for the next display ENTER ACTIVATION CODE Passcode TROUBLESHOOTING Display Reads Use ARROW keys to scroll and find the first number of your Activation Code Press ENTER to select Repeat this step until all digits have been entered Use ESCAPE to correct previous digits Display Reads Activation is complete w...

Страница 12: ...ion of circuits the DC control wires must be separated from the AC control wires A piece of fiber glass sleeving has been provided in the manual kit to achieve this Slide the sleeving over the AC wires OR the DC wires but not both from the wire landing area to the outside of the gen erator Use the cable tie locations to hold the sleeving in place 12 An improperly connected control wire can damage ...

Страница 13: ... the transfer switch 5 When three conductor wiring is used two 120 volt circuits will often share the same neutral wire To avoid overloading the neutral either move BOTH of the circuits that share the neutral or don t move either of them 6 When moving two circuits with a shared neutral they should be connected to adjacent positions one above the other in the transfer switch That will assure that t...

Страница 14: ...the existing electrical distribution panel Install the breaker in two adjacent empty slots one above the other in the main panel 12 When all priority circuits have been moved to the transfer switch close the main breaker to restore utility power and make sure utility voltage at the transfer switch is correct Refer to NFPA 70 E for the safety equipment required when working inside a live transfer s...

Страница 15: ...enerator s main breaker to the ON position The generator is now supplying electricity to the transfer switch but is not carrying any load 5 Be sure that voltage and frequency from the generator is correct If line to line voltage is not approximately 240 volts refer to the Owner s Manual for the proper adjustment procedures On all models if line to neutral voltage is not 120 volts check the neutral...

Страница 16: ...at a time until the generator has accepted the entire priority load 13 With the generator carrying the entire priority load recheck gas pressure to verify that it is at the same level it was before the generator was started NOTE Even if the generator is running smoothly at this point a drop in gas pressure indicates that the supply is barely adequate to supply the generator s needs Changes in the ...

Страница 17: ...ransfer switch enclosure 2 Always inspect the switch for shipping damage Never mount a transfer switch that shows any evidence of damage Check local codes before wiring the transfer switch Some jurisdictions require that wiring inside the switch be done by a licensed electrician 4 All wiring must be the correct size and type and must conform to all codes standards and regulations Refer to the tran...

Страница 18: ...ctrical loads within the panel so the amperage rating of the transfer switch must be equal to or greater than the amperage rating of the normal utility service Unless a service rated transfer switch is used a main service disconnect must be located before the transfer switch The transfer switch must be installed between the utility service entrance and the building distribution panel 2 A service r...

Страница 19: ...ity Supply E Generator Connection Panel T Load Distribution Panel 2 Neutral wires from both the utility and the generator are connected to the same neutral bar in the switch 3 4 Complete the transfer switch wiring by connecting the equipment ground wires from both the utility and the generator to the ground lug 5 Being careful to support the lugs torque the lugs in the transfer switch to the speci...

Страница 20: ...gh the contactor 4 Switch the generator s main circuit breaker OFF and put the mode switch in the OFF position 5 Make sure utility power is OFF and place all of the individual 6 Locate the transfer handle insert the metal end into the slot in the main contactor assembly Pull the handle DOWN to move the main contacts to the standby power generator position NEVER OPERATE THE TRANSFER SWITCH MANUALLY...

Страница 21: ...tility power and make sure the generator starts automatically after the line interrupt delay 14 Switch the utility breaker to ON and make sure that power is automatically transferred back to the utility 15 Shut OFF utility power again to automatically start the generator When power has transferred to the generator close each of the breakers in the distribution panel one at a time until the generat...

Страница 22: ...tioner connect the Y terminal of the thermostat to one of the A C 1 terminals Connect the other A C 1 terminal to the Y terminal on the air conditioner Use 18 26 AWG copper wire Refer to the Owner s Manual for specific torque connection requirements 2 To control a second air conditioner repeat the above using terminals marked A C 2 65 NOTE For specific AC control wire information please refer to t...

Страница 23: ...thermostat wire away from High voltage wires 3 If required connect the second air conditioner to the terminal strip terminals Air 2 Contact Ratings Air 1 2 24 VAC 5 0 Amps Max NOTE These instructions are for a typical air conditioner installation Control of heat pump and 2 stage air conditioners will require special connections A separate contactor relay module can be purchased from the manufactur...

Страница 24: ...l Following transfer switch installation and interconnection inspect the entire installation carefully A competent qualified electrician should inspect it The installation should comply strictly with all applicable codes standards and regulations When absolutely certain the installation is proper and correct complete a functional test of the system 01 13 90 SX EXIV IEXIV 2 If the exercise time or ...

Страница 25: ...23 Electrical Schematic Drawing No 0H6386 B Electrical Data ...

Страница 26: ...24 Electrical Data Wiring Diagram Schematic Drawing No 0H6385 A ...

Страница 27: ...25 Wiring Diagram Schematic Drawing No 0H6385 A Electrical Data ...

Страница 28: ...26 Electrical Data Wiring Diagram Schematic 8kW Drawing No 0J2999 A ...

Страница 29: ...27 Wiring Diagram Schematic 8kW Drawing No 0J2999 A Electrical Data ...

Страница 30: ...28 Electrical Data Wiring Diagram Schematic 8kW Drawing No 0J2999 A ...

Страница 31: ...29 Wiring Diagram Schematic 10 14kW Drawing No 0J3000 A Electrical Data ...

Страница 32: ...30 Electrical Data Wiring Diagram Schematic 10 14kW Drawing No 0J3000 A ...

Страница 33: ...31 Wiring Diagram Schematic 10 14kW Drawing No 0J3000 A Electrical Data ...

Страница 34: ...32 Electrical Data Wiring Diagram Schematic 17 20kW Drawing No 0J3001 A ...

Страница 35: ...33 Wiring Diagram Schematic 17 20kW Drawing No 0J3001 A Electrical Data ...

Страница 36: ...34 Electrical Data Wiring Diagram Schematic 17 20kW Drawing No 0J3001 A ...

Страница 37: ...35 NOTES ...

Страница 38: ...36 NOTES ...

Страница 39: ...37 NOTES ...

Страница 40: ...Part No 0J4873 Revision B 06 29 11 Printed in U S A ...